Laserfiche WebLink
ATTACHMENTI <br />BID SUMMARIES <br />TURNOUT NO 6: BID DATE, October 6, 2006 <br />RANK FIRM BID AMOUNT <br />1 Gatewa Pacific Contractors Inc. $231,312.00 <br />2 Pacific Infrastructure $249,000.00 <br />3 Albay Construction Co. $274,000.00 <br />4 Precision En ineerin $286,253.00 <br />5 West Valle Construction $315,000.00 <br />6 TeraCon Pi eline Inc. $320,773.00 <br />7 Mitchell En ineerin $369,000.00 <br /> Engineer Estimate $300,000.00 <br />BOOSTER PUMP STATION: BID DATE, November 30, 2006 <br />RANK FIRM BID AMOUNT <br />1 JMB Construction $1,785,700.00 <br />2 Albay Construction Co. $2,067,000.00 <br />3 Pacific Infrastructure $2,080,000.00 <br />4 Gateway Pacific Contractors Inc. $2,118,787.00 <br />5 McGuire and Hester $2,145,500.00 <br />6 Mitchell En ineerin $2,375,000.00 <br />7 Proven Mana ement Inc. $2,547,670.00 <br /> Engineer Estimate $2,000,000.00 <br />