My WebLink
|
Help
|
About
|
Sign Out
20B
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
20B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2007 4:18:32 PM
Creation date
2/1/2007 4:12:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
20B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTI <br />BID SUMMARIES <br />TURNOUT NO 6: BID DATE, October 6, 2006 <br />RANK FIRM BID AMOUNT <br />1 Gatewa Pacific Contractors Inc. $231,312.00 <br />2 Pacific Infrastructure $249,000.00 <br />3 Albay Construction Co. $274,000.00 <br />4 Precision En ineerin $286,253.00 <br />5 West Valle Construction $315,000.00 <br />6 TeraCon Pi eline Inc. $320,773.00 <br />7 Mitchell En ineerin $369,000.00 <br /> Engineer Estimate $300,000.00 <br />BOOSTER PUMP STATION: BID DATE, November 30, 2006 <br />RANK FIRM BID AMOUNT <br />1 JMB Construction $1,785,700.00 <br />2 Albay Construction Co. $2,067,000.00 <br />3 Pacific Infrastructure $2,080,000.00 <br />4 Gateway Pacific Contractors Inc. $2,118,787.00 <br />5 McGuire and Hester $2,145,500.00 <br />6 Mitchell En ineerin $2,375,000.00 <br />7 Proven Mana ement Inc. $2,547,670.00 <br /> Engineer Estimate $2,000,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.