My WebLink
|
Help
|
About
|
Sign Out
20A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
20A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:15:40 PM
Creation date
2/1/2007 4:10:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
20A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid Summary <br /> Gateway <br /> Engineer's Pacific Anderson Overall McGuire <br /> Estimate Contractors Pacific Construction and Hester <br />_ ___. <br />Construction ~ ~~ ,f, <br />Estimate $3,400,000 ~ _ <br />-._.__ ~~,,, ~ :::~?~~ - <br /> <br />Construction Bid _. -._~~~~" $3,942,206 $4,246,150 $4,355,000 $5,572,770 <br />Construction Management Specialty Inspection and Soils Engineering/Testing <br />The City commonly enters into a construction management contract to provide technical shop <br />drawing review, specialty inspection services, quality control and often geotechnical (soils) <br />engineering and testing during construction of the City's utility pump stations, reservoirs, and <br />other types of large utility facilities where the City does not have staff specializing in these <br />areas. This partially buried, pre-stressed concrete reservoir project is the type of project that <br />staff believes requires and would benefit from specialty construction management expertise. <br />Earlier this year, the City solicited proposals from six different construction management <br />firms to provide the construction management for the Santos Ranch Road Pump Stations and <br />Water Facilities Upgrade Project. Two firms responded that they would be unable to provide <br />the necessary services for the project due to their current workload, and two of [he other firms <br />indicated that they did not believe they could be competitive in providing a proposal if the firm <br />that designed the pump stations was also included on the construction management selection <br />list. Of the two firms that did submit proposals, the City chose Tetra Tech, Inc. (the designer <br />of the pump stations) to provide these services to the City based upon their construction <br />management expertise and ultimate negotiated bid. Tetra Tech's construction management <br />team of professionals has been on this pump station reconstruction project for approximately <br />four months and to-date, has provided excellent construction management services for the City <br />on this project. <br />Based upon this recent construction management experience and the current high level of <br />bidding and construction work in the Bay Area, City staff requested Tetra Tech to submit a <br />proposal to provide construction management and specialty inspection services for the <br />construction phase of the water reservoir project as an amendment to their construction <br />management contract. <br />Staff has reviewed the rate schedule and professional employee hours that have been proposed <br />by Tetra Tech Inc. and found [he fum's rates to be competitive with other construction <br />management firms doing similar work for the City. Based on a number of factors, including <br />Tetra Tech's qualifications, the fact that they are currently providing excellent construction <br />management services for the City, that the same construction management "team" would be <br />SR 06:152 <br />Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.