My WebLink
|
Help
|
About
|
Sign Out
20A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
20A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:15:40 PM
Creation date
2/1/2007 4:10:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
20A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />Memo to Mayor and City Councilmembers <br />September 19, 2006 <br />Loan # 1 -This loan is needed to assure the City is repaid for sewer work it completed concurrent with <br />the construction of new Vineyard Avenue. As indicated in the Financing Program, it was anticipated <br />that developers would provide all sewer funding and that the City would not provide for the upfront <br />construction of these facilities. However, as part of the construction of Vineyard Avenue, this was <br />completed and reimbursement of $1,178,625 allocated from the City's CIP Sewer Fund is necessary. <br />Loan # 2 - As indicated, in July 2003, the Council approved the CIP project Vineyard Corridor <br />Infrastructure Improvements: Water Tank, Supply Line and Pump Station (011023) in the amount of <br />$3,885,000 for Vineyazd Corridor water improvements. It was anticipated that at least $3,240,000 would <br />be a loan for completing Specific Plan projects repaid from Corridor revenues. <br />Anticipated Loan # 3 -This is a projected new loan of $3,048,138 needed to complete future water <br />improvements. As noted, it is not needed for the projects included for funding in the August 15 staff <br />report. With this loan and the others, the CIP Water Fund has an estimated FY 2007 balance of <br />$3,018,516. Also, as mentioned, the exact amount of this loan is dependent on the amount of V ineyazd <br />Corridor revenue received prior to completing these projects and final project costs. <br />Potential Water Rate Adjustment <br />As indicated above, part of the draft Financing Plan, and a portion of the funding for the repayment of <br />Anticipated Loan # 3, assumes a rate adjustment to meet costs related to water improvements in the area, <br />including over-sizing of the water reservoir from 1.0 million gallons to 1.4 million gallons due to the <br />high demand put on the existing system by lazge residential water customers. Additional capacity was <br />also added to the water turnout and pumping station to meet this additional demand. The cost of adding <br />this capacity (incrementally over-sizing all of these facilities) is estimated to be $1.3 M. Of this amount, <br />staff is recommending $645,000 be met as outlined in CIP (OlOl23). The remaining $655,000 would <br />potentially come from a water rate adjustment for large residential water consumers. <br />The need for over-sizing the water facilities is a direct result of large existing residential water <br />consumers and there aze several ways for the Council as they elect to replenish these monies back to the <br />Water Funds. Three ways available to the Council include Option 1) implement a fourth tier water rate <br />in the City's current water rate schedule for these larger residential water consumers. A fourth tier water <br />rate would include the extra cost of expanding the water system to accommodate the lazge existing <br />residential user and could encourage water conservation; Option 2) increase the residential water <br />connection fee to reflect the increase in the City's water system assets; or Option 3) increase the <br />replacement/improvement accrual portion of the water rates to pay for these improvements to the City's <br />water system. At this time, staff anticipates pursuing Option 1, which is subject to Council approval, <br />after notice is sent to all property owners/customers. <br />SUMMARY <br />As staff indicated previously, this Financing Plan requires additional information, including bids for <br />construction, which will be developed in the future. However, in summary, future infrastructure will be <br />funded from a combination of existing and projected Specific Plan fee revenue from new and existing <br />development, reimbursements due the City for work already completed, a contribution from the CIP <br />Water Fund in the amount of $645,00, and potentially a water rate adjustment. Completing all projects <br />requires use of the existing CIP water project approved previously (Ol 1023) for this work, and a future <br />loan from the CIP Water fund. Upon completing all improvements, it is anticipated the City will have <br />
The URL can be used to link to this page
Your browser does not support the video tag.