My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:05:54 PM
Creation date
2/1/2007 3:47:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2005-06 <br />CAPITAL IMPROVEMENT PROGRAM <br />WATER PROJECTS <br /> Ad'usted Bud et <br /> <br />CIPp Expansion <br />Fund <br />355 497 499 Replacement <br />Fund <br />345 <br />Tofal <br /> BEGINNMG BALANCE $2,478,696 $14,248 867 S16 727 563 <br /> ESTIMATED REVENUES <br /> Water Connection Fees 154 020 0 $154 020 <br /> TOTAL FEE REVENUE 5154020 EO $154020 <br /> TRANSFER TO NEXT YEAR'S REVENUE 154 020 0 $154 020 <br /> INTEREST MCOIvIE Includin Ro'ect Reserves 33 000 265 000 $298 000 <br /> TOTAL ESTIMATED REVENUES $33 000 E265 000 5298 000 <br /> TRANSFERS FROM: <br /> Water M&O Fund -- Re lacement Accrual 0 1 850 000 E 1 850 000 <br /> Water M&O Fund -Debt Pa meets 2004 Water Revenue Bonds 0 485 138 8485 138 <br /> Sewer Re lacement Fund -- SCADA Com user a de 0 195 000 $195 000 <br /> Lower Inwme Housin Fund for Fee Waiver Reimb BRIDGE 20 580 0 20 580 <br /> 7RANSFERS TO: 0 0 SO <br /> General Fwd ---CIP En ineerin moved to ex ndiNres below 0 0 SO <br /> General Fwd --- Utili Cu[ Pamhin moved [o ex endimues below 0 0 SO <br /> Water Debt Service Fwd - 2004 Bonds moved from ex enditures below 242 568 485 138 E727 706 <br /> Loan from Wa[er Replacement for Vineyard Cortidor Infras[mcNre Imprvements <br />Phase III <br />1 985 000 <br />1 985 000 <br />$0 <br /> NET TRANSFERS IN/ OUT El 763 012 $60,000 51,823 012 <br /> TOTAL FUNDS AVAILABLE $4,274708 $14573867 $18848575 <br /> Ex endiNres <br />001000 Annual Water Re lacement Ro ects 0 193 750 $193 750 <br />001026 Hi Ressure Water Main: Montevino Dr-Sautine Wa 135127 0 5135127 <br />001066 Water Loo Pi line -Bonde Loo 60 000 0 $60 000 <br />011012 Pimlico Dr Tumoul & Water Transmission Line Reserve 206 391 814 000 $1 020 391 <br />OI 1014 Transmission Main Re lacement Reserve 0 147,000 $147,000 <br />01IOIS Installation ofa Variable Fre uenc Drive at Well No. 8 0 21,456 $21 456 <br />011016 Installation of a Permanent Generator at Well No. 8 0 125 000 $125,000 <br />OI 1017 New Standb Power Generator: Water Portion 0 90 000 $90 000 <br />OI 1022 Chlorine In ection Sites 0 126,005 $126 005 <br /> <br />OI 1023 Vineyard Comdor Infmstruchue Imp Phase 111 -Water Tank, Supply Lines, Pump <br />Station <br />2,504 324 <br />1,053,807 <br />$3 558,131 <br />031010 Electrical Panel U odes and Restorations 0 70 833 S70 833 <br />031015 Pressure Reducin Valve Im rovements for Hillside Areas 0 46S 000 $465 000 <br />031016 Water anti Im rovement Ro ect to Foothill Tank Additional Fundin 112 500 808 917 $921 417 <br />041000 Annual Water unlit Im rovement Ro~ect 0 65 725 $65 725 <br />041008 Annual Automated Meter Readin Retrofit 0 159751 SI59751 <br />041011 Covtml Valve Ivstallatiovs 0 58,873 $58 873 <br />041013 Annual Re lacement of POl but lene Service La[emis & Irti anon Lines 0 108,420 $108,420 <br />041014 Bonde Zone/ Rub Hill Pi line 203,646 15,895 $219,541 <br />041015 Parallel Lon 'ew Pum Station Line 0 535 000 8535 000 <br />041040 Annual Re lacement of Water Meters 0 233,608 $233 608 <br />048056 2004 Water Bonds -Annual Pa menls moved to transfers above 0 0 SO <br />051015 SCADA Cam uter Hardware and Software U ode 0 390 000 $390 000 <br />051023 McCloud Water Tank Re lacement Refurbislunent 0 75,000 $75,000 <br />061011 Annual Control Valve Installation 0 90,320 $90,320 <br />802010 Water & Sewer Main -Vine ard to Foxborou h -Reimburse Develo er 171 236 0 E171 236 <br />802011 Committee Valle Water Retailers 5 000 0 S5 000 <br />94101 S Del Valle Parkwa Water Main Extension 0 397 306 $397 306 <br />951015 Water unlit Monitors -Phase II 50 % 0 0 SO <br />971013 Water Connection Fee U date 15 000 0 SI S 000 <br />971014 Water S stem Master Plan U ate 0 0 EO <br />991033 Generator Stud Water Portion 0 9 308 $9 308 <br />991034 U ode Tumours to Accommodate Chemical Readouts 19 084 504 E19 588 <br />991035 Santos Ranch Road PS 510 900 1300 Rehabilitation 0 2 604 109 S2 604 109 <br />991069 ReconsWCtion of Watm Wells No. 5 6 and B 0 0 80 <br />999999 Geneml Fund -- Utili Cut Palchin moved from transfers above 0 66 082 $66 082 <br />999999 General Fwd -- CIP En ~neerin moved from transfers above 107 695 218 652 $326 347 <br /> TOTAL WATER PROJECTS $3 540,003 $8 944 321 512 484 324 <br /> ENDING WATER FUND BALANCE 5734 705 S5 629,546 f6 364 251 <br />Water 06 Q4 1/15/2007 821 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.