Laserfiche WebLink
H. DELEGATION OF MAINTENANCE: <br /> <br /> The specific maintenance function indicated below on is hereby <br />delegated to the CITY. This delegation of maintenance function set <br />forth herein does not include areas and functions of which the control <br />and maintenance rest with the local authority under the terms of <br />Freeway Agreements and/or Freeway Maintenance Agreements. <br /> <br /> MAXIMUM <br /> ANNUAL <br />ROUTE LENGTH PROGRAM AUTHORIZED <br />NO. MILES DESCRIPTION OF ROUTING DELEGATED EXPENDITURE <br /> <br />580 4.47 Freeway, from east city None 0.00 <br /> limits 2,970 feet west of <br /> E1 Charro Overcrossing to <br /> west of San Ramon Road <br /> Overcrossing, a length of <br /> 4.47 miles. <br /> <br />680 4.06 Freeway, from south city HM4K $10,000.00 <br /> limits at Happy Valley <br /> Road to the city limits <br /> at the Southern Pacific <br /> Railroad, a length of 0.58 <br /> mile for this portion; <br /> also, freeway, from the <br /> city limits at the south- <br /> west right of way line of <br /> Western Pacific Railroad <br /> to the City limits 250 ft. <br /> northeast of the southwest <br /> right of way line of the <br /> Western Pacific Railroad, <br /> a length of 0.05 mile for <br /> this portion; also, freeway, <br /> from city limits at Bernal <br /> Avenue to north city limits <br /> at intersection with Route <br /> 580, a length of 3.44 miles <br /> for this portion; a total <br /> length of 4.06 miles. <br /> <br />Total Authorized Route 680 $10,000.00 <br /> <br />STATE facilities maintained by the CITY. <br /> <br />680 <br /> <br />Stoneridge Interchange <br /> <br />NB ramp signals <br />2-310 HPS lights <br />SB ramp signals <br />2-310 HPS lights <br /> <br />State Share <br /> <br />50% <br />50% <br />50% <br />50% <br /> <br />-6- <br /> <br /> <br />