My WebLink
|
Help
|
About
|
Sign Out
25A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
25A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:10:43 PM
Creation date
1/12/2007 11:04:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
25A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />significant escalation in costs for this project. This is borne out by other construction bids the <br />City and other jurisdictions have been receiving in this same three-year period. <br /> <br />As provided for in the VCSP Financing Program adopted by City Council, as staff became <br />aware of cost escalations for the construction of core Specific Plan infrastructure, Specific <br />Plan fees have been adjusted to account for the increased costs. In addition, as infrastructure <br />has been constructed, real costs have been replacing cost estimates in determining Specific <br />Plan fees. A summary of water facility cost estimates is attached as Exhibit C which indicates <br />the construction cost escalation for these facilities. <br /> <br />From 2001 to the present, Specific Plan fees per dwelling unit equivalent (DUE's) have <br />escalated from $41,116 per DUE to a current fee amount of $55,000, a 33% increase over a <br />five-year period. The $55,000 per DUE amount was calculated before the tank bid just <br />received by the City. Based upon the tank bid and updated estimated construction and other <br />construction related costs for the remaining water facilities and other infrastructure <br />commitments, the new VCSP fee is now estimated to be $62,500 per DUE. <br /> <br />Currently, staff is estimating that the combined total cost (not just construction costs, but all <br />remaining design and construction management costs included) for the water facilities <br />remaining to be constructed within the VCSP area to be approximately $8.5 million. This <br />includes the recommended award of the tank and rough-graded access.. road bid and <br />recommended construction management/soils engineering work that are the subjects of this <br />staff report. The updated. estimate of $8.5 million includes all design, construction <br />management, soils engineering, construction staking, permitting and utility work (needed for <br />the pump station) for the project. The table below shows the new estimates of the remaining <br />work related to water facilities: <br /> <br />Water Tank <br />Bid Price <br />Construction Support <br />Contingency <br />Subtotal <br /> <br />$3,942,206 <br />$507,000 <br />$152,000 <br />$4,601,206 <br /> <br />Completion of Access Road <br />Design Fees (remaining) <br />Construction Estimate <br />Construction Support <br />Subtotal <br /> <br />$120,000 <br />$1,000,000 <br />$100,000 <br />$1,220,000 <br /> <br />SR06:152 <br />Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.