My WebLink
|
Help
|
About
|
Sign Out
25A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
25A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:10:43 PM
Creation date
1/12/2007 11:04:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
25A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Part 4 -Includes Lots 19 (planned panially for the school site). 20. 21. and 25-33 located in the <br />eastern portion of the Vineyard Corridor area. <br /> <br />Infrastructure Type of Improvement Estimated Cost <br />Component <br />Sewer Eight-inch sewer trunk line within the realigned $200.000 <br /> Vineyard Avenue from the east end of Lot 18 to the <br /> eastern boundary of the Specific Plan Area <br />Roadway Realignment of Vineyard Avenue from the east end of $1.870.000 <br /> Lot 18 to the eastern Specific Plan Area boundary. and <br /> trail and landscape improvements to the existing <br /> Vineyard Avenue section between the northwest comer <br /> of Lot 8 ("S"-curve) and the eastern border ofthe Plan <br /> Area <br />Storm Water All planned storm water detention facilities east of $651.000 <br />Detention Lot 18, plus outfall at Lot 32 <br /> <br />Part 5 - Relates to all lots within the Specific Plan Area (Lots 1-33). Part 5 consists of all of the <br />"non-minimum" shared infrastructure improvements. <br /> <br />Infrastrudure Type of Improvement Estimated Cost <br />Component <br />Water Water tank. supply line, and pump station $1.900.000 <br /> reimbursement to City (improvements to be <br /> constructed at such time as considered 10 be necessary <br /> by the City <br />Utility Utilities undergrounding along the Lot 18 frontage of $1.260.000 <br />Undergrounding the existing Vineyard Avenue <br />Specific Plan Reimbursement of Specific Plan consultant fees $250.000 <br />Preparation 10 the City <br />Vista Diablo Reimbursement for $10,340 shared water $ 10.340 <br />Water improvements <br />Reimbursement <br />Vista Diablo Reimbursement for $285,579 shared roadway $285579 <br />Roadway improvements to Vineyard Avenue <br />Reimbursement <br />
The URL can be used to link to this page
Your browser does not support the video tag.