My WebLink
|
Help
|
About
|
Sign Out
25A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
25A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:10:43 PM
Creation date
1/12/2007 11:04:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
25A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ExamDle 10D. Following installation of the Part 3 water line improveml!/lts. Lot <br />27 wishes to connect the existing house to the water system. The owner alLot :y- <br />would pay a fee equal to 1 existing house x $8,131 per existing home water <br />connection, or 58, 131. If Lot 27 is later subdivided the I!xisting home water <br />connection fee (as it is then calculated) would be credited against the IOtalfl!es <br />owed <br /> <br />Financing Program #11. As development proceeds in the Specific Plan Area. the costs <br />of shared infrastructure improvements will be adjusted. and the fees owed by any Lot <br />shall be adjusted to reflect any changes. Adjustments to costs shall include the following: <br /> <br />(a) actual costs incurred by developers installing shared infrastructure <br />improvement components; <br /> <br />(b) actual costs of all City-installed infrastructure improvement components: <br /> <br />(c) adjustments to initial cost estimates to reflect inflationary cost increases or <br />refinements; <br /> <br />(d) interest owed to developers on the reimbursable portion of infrastructure <br />improvement components installed (beyond the developer's pro rata share) <br />at 8o/o/year; <br /> <br />(e) interest owed the City on any City-installed infrastructure improvement <br />component installed with non-Specific Plan funds at 80/o/year; and <br /> <br />(f) an annual Specific Plan administration fee of$4000/year. <br /> <br />The specifics of these adjustments and how they relate to an adj usted fee over time are <br />described in Financing Programs #12-16. <br /> <br />Financing Program #11. In the event a developer installs shared infrastructure <br />improvements. the final determination of the Specific Plan fee shall be determined <br />following completion of the construction of the improvements and determination of its <br />actual cost. Actual cost shall be determined by the City Engineer based on developer's <br />record of actual costs and the City Engineer's determination as to the appropriateness of <br />these costs based on ordinary and normal construction practices. The City Engineer's <br />determination shall be final. Adjustments to share infrastructure improvement costs shall <br />operate prospectively only, whether such costs increase or decrease. <br /> <br />Examole 12A. Developer of Lot 12 installs Part 1 sewer improvements whose <br />actual cost is 550.000 less than the estimate. 1tsfees will be a4;usted as the sewer <br />component of the total costs is reduced by 550.000 and all shares are ac1justl!d <br />downward accordingly. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.