My WebLink
|
Help
|
About
|
Sign Out
25A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
25A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:10:43 PM
Creation date
1/12/2007 11:04:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
25A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />6C <br /> <br />- <br /> <br />pLEASANTONo <br />MEMORANDUM <br /> <br />Date: <br /> <br />September 19,2006 <br /> <br />To: <br /> <br />Mayor and City Council members <br /> <br />~v <br /> <br />From: <br /> <br />Nelson Fialho, City Manager <br />Steven Bocian, Assistant City Manager S'5 <br /> <br />Subject: <br /> <br />Draft Financing Plan for Vineyard Avenue Corridor Specific Plan Infrastructure <br />Improvements <br /> <br />This memorandum is in response to a City Council request to provide a draft financing plan (Attachment <br />A) for Vineyard Corridor infrastructure improvements outlined in the August 15,2006 staff report <br />recommending awarding of contracts for water facility improvements (including water storage tank, <br />finished access road, Zone 7 turnout and pump station). <br /> <br />BACKGROUND <br /> <br />In March 2000, the City Council approved the "Vineyard Avenue Corridor Shared Infrastructure <br />Financing Program" (Financing Program) (Attachment B) to finance the utility and roadway <br />improvements identified in the Vineyard Avenue Corridor Specific Plan (Specific Plan). The Financing <br />Program was based on the Specific Plan's general financing concepts that included the following: <br /> <br />. To implement a fair and equitable method of spreading the costs of financing shared <br />infrastructure improvements. <br /> <br />. To establish a coordinated and efficient program of phasing infrastructure improvements which <br />allows private developments, an elementary school, and a community park to develop in as <br />timely a manner as possible. <br /> <br />While the anticipated Specific Plan infrastructure improvements are extensive with significant detail, for <br />the purpose of this memo, they can be summarized as follows: <br /> <br />. Water System Improvements - Construction of a water storage facility (reservoir), modifications <br />to an existing Zone 7 turnout, water supply lines and construction of a pump station. <br /> <br />. Sewer System Improvements - Construction of required sewer lines and a sewer pump station. <br /> <br />. Roadway Improvements - Realignment of Vineyard A venue, trail and landscaping <br />improvements to "Old Vineyard", and roadway landscaping. Also included were <br />reimbursements for Ruby Hill "s" Curve straightening and Vista Diablo Street frontage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.