My WebLink
|
Help
|
About
|
Sign Out
23
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:07:47 PM
Creation date
1/11/2007 3:15:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Green Building Worksheet <br />Project Name <br />LEED 112.1 Rating System Analysis <br /> <br />Indoor Environmental Quality <br /> <br />'I' Install a permanent carbon dioxide (C02) <br />monitoring system that provides feedback <br />r on space ventilation performance in a form <br />I that affords operational adjustments <br />-------~-1---_____M ___+_~ <br />; For mechanically ventilated buildings, design I <br />ventilation systems that result in an air ! <br />change effectiveness (Eac) greater than or I <br />equal to 0.9 as determined by ASHRAE 129-1 <br />1997. ' <br /> <br />Credit Cat 0 <br />- <br /> <br />1 Name <br /> <br />Prerequisite 1 Minimum IAQ <br />Performance <br /> <br />Prerequisite 2 Environmental <br />Tobacco Smoke (ETS) Control <br /> <br />Credit 1: Carbon Dioxide (C02) <br />M'Jnitoring <br /> <br />Credit 2: Ventilation Effectiveness <br /> <br />Credit 3.1: Construction lAQ <br />M,magement Plan, During <br />Construction <br /> <br />Credit 3.2: Construction IAQ <br />M.magement Plan, Before <br />Oc:cupancy <br /> <br />Cn,dit 4.'1: Low-Emitting Materials, <br />Aohesives & Sealants <br /> <br />_u r <br />i <br />I <br /> <br />Intent I Requirements <br />Establish minimum indoor air quality (IAQ) <br />performance to prevent the development of ! <br />indoor air quality problems in buildings, ! <br />maintaining the health and well being of the ! <br />occupants. I <br />Prevent--e~pOSure--of-buij'ding occupants anci i <br />systems to Environmental Tobacco Smoke I <br />(ITS). i <br />---------- r <br />, <br />, <br />i <br />! <br />I <br /> <br />o <br /> <br />Poss <br /> <br />o <br /> <br />Y i <br />I <br />+--j <br />I Y <br />! <br />, <br /> <br />i <br /> <br />Develop and implement an Indoor Air Quality I <br />(IAQ) Management Plan for the construction! <br />and pre-occupancy phases of the building. I <br />! <br /> <br />i <br /> <br />i I <br />i I <br />j : <br />II <br />I <br /> <br />t- <br />Conduct a minimum two-week building flush-i <br />out with new filtration media at 100% I <br />outside air after construction ends and prior i <br />to occupancy, OR conduct a baseline indoor <br />air quality testing procedure consistent with <br />current EPA Protocol. <br /> <br />I r <br />I <br />, <br />I <br /> <br />Adhesives & Sealants must be less than the <br />current VOC content limits of South Coast <br />Air Quality Management District Rule #1168 <br />by, AND all sealants used as a filler must <br />meet or exceed the requirements of the <br />Area Air Quality Management District Reg. <br /> <br />Page 12 of IS <br /> <br />Y <br /> <br />7 N <br /> <br />The HVAC system will be designed to meet the <br />ventilatio requiremtns of ASHRAE 62.1999 and all <br />published Addenda. PotentiallAQ problems will be <br />located on the site and air intakes will be located away <br />from contaminant sources <br /> <br />I <br />I <br />i .. j <br /> <br />... -l----J Smoking will be prohibited in the building. <br /> <br /> <br />I N I <br />I..' I - FUrthe; :~Sign Wil~~e~Uj:~ ~~~~t::-i.~~~;~~: HVAC <br /> <br />. system can be designed to result in an air change <br />! effectiveness greater than or equal to 0.9 as determined by <br />r ASHRAE 129-1997. <br />, , <br /> <br />I <br />- - -~ <br /> <br />An Indoor Air Quality Management Plan will be <br />developed and Implemented for the construction and <br />pre-occupancy phases of the """ding. The <br />installation of materials will be sequenced to avoid <br />contamination of absorptive materials such as <br />insulation, carpeting, ceiling tile and gyp.bd. <br /> <br />__-1-____ <br />I <br />I <br />i <br />I <br /> <br />A minimum two week building flush-out will be <br />performed with new filtration media at 100% outside <br />air after construction ends and prior to occupancy. <br /> <br />--. <br />r <br />! <br /> <br />Contract documents will specify that adhesives and <br />, sealants will meet the requirements of the South Coast <br />I Air Quality Management District Rule #1168, and all <br />I sealants used as a filler will be specified to meet the <br />requirements of the Bay Area Air Quality Management <br />I District Reg. <br />..J <br /> <br />__I <br /> <br />Printed 10/18/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.