Laserfiche WebLink
<br />Green Building Worksheet <br /> <br />Project Name <br />LEED v2.1 Rating System Analysis <br /> <br />Materials & Resources <br /> <br />Credit Cate 0 <br />- <br /> <br />Intent / Requirements <br /> <br />Please describe how your project would be designed <br />to qualify for this credit. <br /> <br />/ Name <br /> <br />Pass <br /> <br />y <br /> <br />7 <br /> <br />N <br /> <br />Provide an easily accessible area that serves i <br />the entire building and is dedicated to the I The trash enclosure will be sized to accommodate <br />separation, collection and storage of ! 0 Y <br />materials for recycling including (at a I separate containers for paper, corrugated cardboard, <br />; , . glass, plastics and metals. <br />minimum) paper, corrugated cardboard, :,. i i <br /> <br />---I~:~a;~::I~a:~;~t~;~isti;;9 building: +-Lf---- -~- <br /> <br />Credit 1.1: Building Reuse, Maintain ~' structure and Sh, ell (exterior skin and i I iN' <br />75% of Existing Walls, Floors & Roof framing, excluding window assemblies and Ii: i <br /> <br />------ . ~:~~;;;~::~~~~o::~ :s~e;~~~% total) of : f---l <br /> <br />Credit 1.2: Building Reuse, Maintain I existing building structure and shell (exterior I I I <br />1:>0% of Existing Walls, Floors & skin and framing, excluding window I I I ! N <br />Rl)()f i assemblies and non-structural roofing I 'I: <br /> <br />u_ ---------I! - material). -+-t-+-+ <br /> <br />Maintain 100% of existing building structure I' . i I j <br />and shell (exterior skin and framing, I,: <br />Credit 1.3: Building Reuse, Maintain I excluding window assemblies and non- I I <br />100% Shell & 50% Non-Shell i structural roofing material) AND at least I <br />I 50% of non-shell areas (interior walls, doors,! <br />- ______Lflo~_c~verin~s_andCe"mgSystems). --:r! - <br /> <br />I Develop and implement a waste <br />I management plan, quantifying material <br />CI edit 2.1: Construction Waste diverSion goals. Recycle and/or salvage at , <br />I least 50% of construction, demolition and I 1 <br />Management, Divert 50% <br />I, land clearing waste. Calculations can be I' <br />! done by weight or volume, but must be _ Ii! <br />! consistent throughout. i I: I I <br /> <br />-~I:nd~~~~~~n~~~f~~~~t~~;Waste, ,~ T~~~e;f~~0:1;~~~}.addltiOnal~5~_J_l, 1__i-j_N r-- ~--- -- --- <br /> <br />C - d.t 3 1 R R S"fy I Use salvaged, refurbished or reused I r I ' I <br />5:: I .: esource euse, peel i materials, products and furnishings for at I ,! _ N I <br /> <br /> <br />~:~it 3.2: Resource Reuse, Specify ! ~~if~g1~~~~~:~E;:~:;:~;at-rI--I__j ~: <br /> <br />P"erequisite 1 Storage & Collection <br />of Recyclables <br /> <br /> <br />N <br /> <br />A waste management plan will be implemented during <br />construction to recycle or salvage at least 50% of <br />construction, demolition and land clearing waste. <br /> <br />Page 9 of 15 <br /> <br /> <br /> <br />Printed 10/18/06 <br />