Laserfiche WebLink
<br />Sustainable Sites <br /> <br />Credit Cat 0 <br />- <br /> <br />/ Name <br /> <br />Credit 6.1: Stormwater <br />Management, Rate and Quantity <br /> <br />Credit 6.2: Stormwater <br />Management, Treatment <br /> <br />Credit 7.1: Heat Island Effect. Non- <br />RJof <br /> <br />Green Building Worksheet <br />Project Name <br />LEED v2.1 Rating System Analysis <br /> <br />Intent / Requirements <br /> <br />Pi..... describe how your proj.ct would be designed <br />to qualify for this cr.dit. <br /> <br />Pass <br /> <br />y <br /> <br />7 <br /> <br />N <br /> <br />If existing imperviousness is less than or <br />equal to 50%, implement a stormwater <br />management plan that allows no net <br />increase in the rate and quantity of <br />stormwater run-off from existing to <br />developed conditions; OR, if existing <br />I imperviousness is greater than 50%, , i I I <br />t implement a stormwater mana~ement plan I !! [ <br />I that results in a 25% decrease In the rate I I I ! I <br /> <br />--l-~~a::~t:;~e:~:::~;~:o:,~ove -t-il i 1-i -Bioswales have ::~~e~~o~~~ ~ndscape areas <br /> <br />i 80% of the average annual post I ' of the site to remove 8096 of the average annual <br />'I development total suspended solids (TSS), ! j post dewlopment total suspended solids (TSS), and <br />and 40% of the average annual post I I i 4096 of the average annual post development total <br />I development total phosphorous (TP), by I phosphorous (TP), by Implementing Best <br />implementing Best Management Practices! I I Management Practices (BMPs) outlin.d in EPA's <br />' (BMPs) outlined in EPA's Guidance i I Guidance Specifying Management Measures for <br />Specifying Management Measures for I i I' Sources of Non~point Pollution in Coastal Waters <br />Sources of Non-point Pollution in Coastal I (EPA 84Q-B-92..o02 1/93). <br />Waters (EPA 840-B-92-002 1/93). i I <br /> <br /> <br />Provide shade (within 5 years) and/or u~e---"J!-! H T I <br />light-colored/high-albedo materials and/or I <br />open grid pavement for at least 30% of non i : <br />roof impervious surface on the site, I <br />including parking lots, walk-ways, plazas, i <br />etc.; OR, place a minimum of 50% of parking I <br />space underground or covered by structuredl <br />parking; OR use open-grid pavement system I <br />(LESS than 50% imperviousness) for a <br />minimum of 50% of the parking lot area. I <br /> <br />N <br /> <br />i <br />I <br />1] <br /> <br />At least 30% of new all non-roof impervious surfaces <br />on the site will be constructed of high-albedo materials <br />or will be shaded in 5 years. <br /> <br />Page 4 of 15 <br /> <br />Printed 10/18/06 <br />