My WebLink
|
Help
|
About
|
Sign Out
23
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:07:47 PM
Creation date
1/11/2007 3:15:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />building measures shall be submitted in conjunction with the plans submitted for issuance <br />of building permits and shall be subject to the review and approval by the Planning <br />Director prior to issuance of building permits for the project. <br /> <br />53. The proposed LEEDâ„¢ Green Building Checklist shall be shown on one of the first two <br />pages of the plans submitted for the issuance ofa building permit. The sheet number(s) <br />where each checklist item is addressed in the plan set shall be noted on the checklist. All <br />proposed green building measures shall be shown throughout the plan set, as appropriate, <br />as determined by the Planning Director and the Chief Building Official. <br /> <br />54. The Building and Safety Division may require special plan check or inspections for the <br />green building measures proposed. If required, the applicant shall provide verification to <br />the Planning Department clearly stating that the Building and Safety Division approved <br />all applicable requirements relating to green building measures. Said verification shall be <br />provided prior to occupancy. <br /> <br />55. The applicant shall implement the following measures with the construction of the <br />structure covered by this approval so that a roof-mounted photovoltaic system can be <br />installed in the future: <br /> <br />a. Install electrical conduit and pull string from the roof/attic areas to the <br />building's main electrical panels; <br /> <br />b. Engineer the roof trusses to handle an additional load as determined by a <br />structural engineer to accommodate the additional weight of a prototypical <br />photovoltaic system beyond that anticipated for roofing; and <br /> <br />c. Provide an area near the electrical panel for the "inverter" required to <br />convert the direct current output from the photovoltaic panels to alternating <br />current. <br /> <br />These measures shall be indicated on the building permit plan sets. <br /> <br />BUILDING <br /> <br />56. The building shall meet the applicable Title 24 state energy requirements. <br /> <br />57. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building and Safety Division will issue permits. <br /> <br />58. The applicant shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasanton. These plans shall be approved by the Chief Building <br />Official prior to the issuance of a building permit. The site development plan shall <br />include all required information to design and construct site, grading, paving, drainage, <br />and utilities. Specific items to be indicated on the site development plan necessary to <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.