Laserfiche WebLink
<br />9. The applicants shall install thermoplastic reflective paint for the outermost <br />(northernmost) bicycle lane striping along the church's Stoneridge Drive frontage. <br /> <br />10. The City Traffic Engineer shall consider appropriate mitigation measures on Rheem <br />Drive to address the neighbors' traffic concerns. <br /> <br />II. During Sunday services, the church shall place a few temporary A-frame signs along the <br />Rheem Drive separated sidewalk planter south of the church site which state: "St. <br />Elizabeth Seton Church members, please don't park in front of residences during Sunday <br />services" or similar language acceptable to the Planning Director. <br /> <br />12. The church shall regularly inform its members to park at the church site, park in the <br />parking lot at the 2174-2186 Rheem Drive property, or park along the church's <br />Stoneridge and Rheem Drive frontages, but not park in front of the adjacent residential <br />neighborhoods or the off-street parking spaces in the other light industrial/office <br />developments along Rheem Drive. <br /> <br />13. Prior to issuance of a building permit, the applicants shall obtain a written parking <br />agreement from the property owners of2174-2186 Rheem Drive to use their parking lot <br />during the church's evening Sunday services. Ifthe applicants cannot secure a parking <br />agreement with the 2174-2186 Rheem Drive property, then the church shall secure <br />another suitable off-site parking area for overflow parking, subject to the review and <br />approval of the Planning Director, or shall construct an on-site gravel parking lot in the <br />undeveloped eastern side of the church site to accommodate overflow parking. The exact <br />location and design of the on-site parking shall be subject to the review and approval by <br />the Planning Director prior to installation. Should the parking agreement ever be <br />terminated, the church shall notify the City immediately. The church shall secure, within <br />30 days of the termination, another suitable off-site parking area for overflow parking, <br />subject to the review and approval of the Planning Director, or shall construct within 60 <br />days an on-site gravel parking lot in the undeveloped eastern side of the church site to <br />accommodate overflow parking. The exact location and design of the on-site parking <br />shall be subject to the review and approval by the Planning Director prior to installation. <br /> <br />14. If the Planning Director determines that the off-site parking at 2174-2186 Rheem Drive is <br />not being effectively used by the Church, the applicants shall work with the Planning <br />Director to investigate options to increase the effectiveness of the off-site parking lot. If <br />the Planning Director determines that this off-site parking continues not to be used, the <br />Planning Director may inform the Church to construct an on-site gravel parking lot in the <br />undeveloped eastern side ofthe Church site to accommodate the overflow parking within <br />60 days. The exact location and design to be subject to the review and approval of the <br />Planning Director prior to installation. <br /> <br />15. The two existing entrance gates to the western parking lot shall be closed when the <br />church is closed or when the parking lot is not needed for church parking. <br /> <br />2 <br />