Laserfiche WebLink
Resolution No. 90-09 <br /> <br />0 <br /> <br />e <br /> <br />For the installation or <br />relocation of each floor <br />furnace, including vent <br /> <br />For the installation or <br />relocation of each suspended <br />heater, recessed wall heater <br />or floor-mounted unit heater <br /> <br />For the installation or <br />relocation or replacement <br />of each appliance vent <br />installed and not included <br />in an appliance permit <br /> <br />For the repair of, <br />alteration of, or addition <br />to each heating appliance, <br />refrigeration unit, cooling <br />unit, absorption unit, or each <br />heating, cooling, absorption, <br />or evaporative cooling system, <br />including installation of controls <br />regulated by this code <br /> <br />For the installation or <br />relocation of each boiler <br />or compressor to and including <br />100,000 Btu/h <br /> <br />For the installation or <br />relocation of each boiler <br />or compressor over three <br />horsepower to and including <br />15 horsepower, or each <br />absorption system over <br />100,000 Btu/h and including <br />500,000 Btu/h <br /> <br />For the installation or <br />relocation of each boiler or <br />compressor over 15 horsepower <br />to and including 30 horsepower <br />or each absorption system <br />over 500,000 Btu/h to and <br />including 1,000,000 Btu/h <br /> <br />9.00 <br /> <br />9.00 <br /> <br />4.50 <br /> <br />9.00 <br /> <br />9.00 <br /> <br />16.50 <br /> <br />22.50 <br /> <br />- 11 - <br /> <br /> <br />