My WebLink
|
Help
|
About
|
Sign Out
PC 89-023
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1989
>
PC 89-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:03 AM
Creation date
12/18/2006 10:04:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT NO
PC 89-23
DOCUMENT NAME
PUD-89-2
NOTES
Chet Richards and Jessie Pries
NOTES 3
1045 Division St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. That the applicant complete all necessary bank stabilization <br />work along the Arroyo del Valle as required by Zone 7. <br />10. That the applicant shall dedicate an approximately 1.8 acre <br />portion of the site to Zone 7 and grant an access easement to <br />Zone 7 through the proposed 20 foot wide on-site access <br />driveway.' <br />11. That this development plan shall be contingent upon the <br />City's acceptance of a recreation easement from Zone 7 over <br />the portion of the site dedicated to Zone 7 and shall be <br />subject to any conditions which may be attached therein. <br />12. That the developer shall enter into an agreement to hold the <br />City harmless if any improvements are made to property <br />(passive open space area) located within the areas of the <br />future recreation easement. <br />13. That a detailed plan depicting all arroyo improvements shall <br />be submitted for approval by the Planning Director prior to <br />the issuance of any building permits for the project. This <br />final improvement plan shall be accompanied by a soils <br />report. A supplemental tree report shall also be required if <br />any existing trees in the arroyo area are impacted. <br />14. The on-site storm drainage, water, and sanitary sewer systems <br />for this development shall be private systems and shall be <br />maintained by the property owner(s). The existing storm <br />drain which conveys storm drainage from Division Street <br />across the site to the channel shall be a public system <br />maintained by the City. This line shall be redesigned, <br />relocated, and installed to the satisfaction of the City <br />Engineer. A 15' wide P.S.E. over this storm drain line shall <br />be granted to the City. Vehicle access shall be required to <br />all manholes and inlets on this line. <br />15. The developer shall re-stripe Division Street from the Wixam <br />Bridge to a transition area south of this development to <br />provide for the following laving: <br />a. 5' wide southbound bike lane (on-street); <br />b. 12' wide southbound vehicle lane; and <br />c. 13' wide northbound vehicle lane. <br />16. The developer shall submit the following plans to Engineering <br />Services for review and approval prior to building permit <br />issuance: <br />a. Two sets of the on-site development plan(s); <br />b. Two sets of improvement plans for the Division Street <br />improvements and for any on-site public improvements <br />(plan and profile); and <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.