<br />35. The project developer acknowledges that the City of Pleasanton does not <br />guarantee the availability of sufficient sewer capacity to serve this development <br />by the approval of this case, and that the project developer agrees and <br />acknowledges that building permit approval may be withheld if sewer capacity is <br />found by the City not to be available. <br /> <br />36. This approval does not guarantee the availability of sufficient water to serve the <br />project. The City shall withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is in effect, unless the <br />City has adopted a water offset program and unless the project developer is <br />participating in the program. Notwithstanding the project developer's <br />participation in such a program, the City may withhold building permits if the City <br />determines that sufficient water is not available at the time of application of <br />building permits. <br /> <br />Planning Requirements: <br /> <br />37. The project developer shall survey the building pad heights to verify their <br />conformance to the approved building pad elevations on Exhibit "A". Said <br />verification shall be performed by a licensed land surveyor or civil engineer, and <br />shall be completed and provided to the Planning Department before the building <br />foundations/slabs are formed. <br /> <br />38. The project developer shall survey the heights of the structures to verify their <br />conformance to the approved building height as shown on Exhibit "A". Said <br />verification shall be performed by a licensed land surveyor or civil engineer, and <br />shall be completed and provided to the Planning Department before the first <br />framing or structural inspection of each building on each lot by the Building and <br />Safety Division. <br /> <br />39. The homes covered by this approval shall be constructed to encourage <br />telecommuting by providing as an option telecommunications infrastructure <br />consistent with state-of-the-art methods at the time that the homes are submitted <br />for site-specific design review approval. <br /> <br />40. A list of all green building measures used in the design of the home(s) shall be <br />provided for the review and approval of the Planning Director with the application <br />for design review approval for the home(s). Each home shall be designed to <br />include a minimum of 50 points using the ACWMA's Green Points rating system <br />with a minimum of ten points in each category (Resources, Energy, and <br />IAQ/Health). <br /> <br />41. The project developer shall submit a waste management plan to the Building and <br />Safety Division prior to issuance of building or demolition permits. The plan shall <br />include the estimated composition and quantities of waste to be generated and <br /> <br />10 <br />