Laserfiche WebLink
<br />The project developer shall implement Comment 1 b of the Cotton/Shires letter - <br />provide an analysis of storm drainage impacts to the proposed building pads - <br />with the tentative subdivision map application. <br /> <br />21. The project developer's geotechnical consultant shall review and approve all <br />foundation, retaining wall, and drainage geotechnical aspects of the final <br />development plans to ensure that the recommendations have been properly <br />incorporated into the development. The consultant shall certify by writing on the <br />plans or as otherwise acceptable to the Director of Building Inspection that the <br />final development plan is in conformance with the geotechnical report approved <br />with the project. <br /> <br />22. The project developer shall annex this development and the open-space area to <br />be deeded to the City to the Lemoine Ranch Geologic Hazard Abatement District <br />(GHAD). The project developer shall be responsible for preparing all necessary <br />documentation to annex to the Lemoine Ranch GHAD including any expenses of <br />the City's geotechnical engineer for the GHAD. The project developer shall be <br />responsible for paying a catch-up payment to the GHAD assessments and any <br />expenses of the City's geotechnical engineer prior to the approval of the final <br />map. Upon recordation of the final subdivision map, the project developer and/or <br />lot owners shall be responsible for paying the future annual GHAD assessments <br />for the development and the public open-space area. <br /> <br />23. At the tentative map stage, the applicant shall work with staff to reduce the height <br />of the slope banks on the west side of Lot 6 and on the south side of Lot 7 facing <br />the proposed Public Street and Old Foothill Road. Measures such as using <br />additional, lower retaining walls and/or split pads shall be considered. <br /> <br />24. At the tentative map stage, staff shall discuss the means to permanently <br />preserve the open space area, and shall make a recommendation to the <br />Planning Commission. <br /> <br />25. With the first construction phase, the project developer shall construct the public <br />infrastructure including the street and cul-de-sac, mass grading for the lots, bio- <br />retention pond/swales, perimeter landscaping in the open space area, the shared <br />access driveways, and all entry landscaping along Foothill Road, Old Foothill <br />Road, and Austin Place. The applicant shall work with Parks and Community <br />Services staff to design a coordinated entry landscape plan for the development <br />and the Alviso Adobe Park, and shall install such landscaping. <br /> <br />26. With the application for the tentative subdivision map, the project developer shall <br />submit the following: <br /> <br />a. An updated tree analysis for the eight-lot portion of this development; and, <br />b. A mitigation plan showing the location of protective fencing for the trees, <br />swales, seeps, etc. <br /> <br />8 <br />