Laserfiche WebLink
data i 1 s , and front yard 1 ands c ap i ng _ <br />4_ The grading t aKe s i nto a ccount env i t onme nta 1 <br />characteristic s and i s designed in ]te ep i ng w ith <br />the best eng i ne ar ing practice s to avo i d erosion , <br />s 1 ide s, or f 1 ood ing to have a s m i n ima 1 an e f f e ct <br />upon the environment a s po s s i b 1 e_ <br />The app 1 i cant propose s to excavat e up t o <br />approximate 1y f ive £ eat o £ the r ear portion o f the <br />pro j act s i t e the top - o f -banK o f the Arroyo d e l <br />Va 1 1 e_ S ome f i 1 1 i ng w i 1 1 be done i nt o the Arroyo _ <br />Grading wi 1 1 l ower the top - o £ -ba nlc o f the Arroyo <br />up to £ ive f e et and w i 1 1 re su 1 t i n the remove 1 o f <br />s eves 1 tree s 1 ocated a 1 ong the top - o £ -bank a nd <br />from w i th i n the Arroyo de l Va 1 1 e_ Grading a l s o <br />require s the i n st a l l at i on o£ •• r ip -rap •• mat er i a 1 s_ <br />New tree s w i 1 1 be i nsta 1 1 ed w i th i n the Arroyo de 1 <br />Va 1 1 e a nd a long i t s top - o f -bank _ R i p -rap <br />mater i a 1 s w i 1 1 be covered w i th top s o i l and <br />hydro s ceded _ Overa 1 1 grading impact s to the <br />Arroyo de 1 Va 1 1 e are considered t o be m i nor _ <br />5 _ The street s and bu i 1 d i ngs have been designed a nd <br />1 ocated to comp 1 ement the n atura 1 t erra i n a nd <br />1 and s cap ing and the t op ogr aph i s £ e a tur e s o f th e <br />site c <br />The proposed project genera 1 1y c on £ o rms t o th e <br />site ' s topography a nd con figuration _ The <br />app 1 i cant mu s t excavat e a portion o f the s i to area <br />to a ccommodat e the proposed unit design a nd to <br />Great e enough f l at area f or the project ' s a cce s s <br />driveway _ Grading , s ite design , a nd bu i 1 d i ng type <br />require s the remove l o f a subst ant i a l number o f <br />existing tree s £ rom the s i t e _ New 1 and s c ap i ng , <br />i nc 1ud ing 1 arge specimen tree s w i 1 1 be p 1 a nt ed by <br />the pro j act deve 1 oper _ <br />6_ The p l an c on f orms t o the purpose s o f the PUD <br />District <br />The proposed project con forms to the purpose s o f <br />the PUD Ord i nanc e by providing s a f e a cce s s t o the <br />site , adeguat a on-sit a parK i ng , and no i s e <br />mitigation f or i rater i or a nd exterior areas _ <br />NOW , THEREFORE , THE PLANN S NG CONII~Z= S S = ON OF THE C STY O F PLEA SANTON <br />RESOLVE S AS FOLLOWS C <br />Section 1 o Recommend s the approve l o f the app l i c at i o n o£ <br />D ivi s i on Street Partner s £ or p 1 a need un i t deve 1 opment <br />rezoning and deve 1 opment p l a n approve 1 f or n i ne 1, 8 0 0 <br />s q_ £t _ s i rag 1 e- f am i 1y home s 1 ocated at 1 0 4 5 D iv i s i on <br />