Laserfiche WebLink
<br />a) The project developer shall submit a final grading and drainage plan prepared by a li- <br />censed civil engineer depicting all final grades and on-site drainage control measures in- <br />cluding bio-swales. Irrigated bio-swales shall be redesigned as needed to the satisfaction <br />of the City Engineer to optimize the amount of the storm water running off the paved sur- <br />face that enters the bio-swale at its most upstream end. This plan shall be subject to the <br />review and approval of the City Engineer prior to the issuance of any building permits, <br /> <br />b) The project developer shall submit sizing designs criteria to treat stormwater runoff at the <br />time of plan submittal. <br /> <br />c) Landscaping shall be designed to minimize irrigation and runoff, promote surface infiltra- <br />tion where appropriate, and minimize the use of fertilizers and pesticides that can con- <br />tribute to stormwater pollution. <br /> <br />1) Structures shall be designed to discourage the occurrence and entry of pests into <br />buildings, thus minimizing the need for pesticides. <br />2) Where feasible, landscaping shall be designed and operated to treat stormwater <br />runoff, In areas that provide detention of water, plants that are tolerant of satu- <br />rated soil conditions and prolonged exposure to water shall be specified. Soil shall <br />be amended as required, <br />3) Plant materials selected shall be appropriate to site specific characteristics such as <br />soil type, topography, climate, amount and timing of sunlight, prevailing winds, <br />rainfall, air movement, pattems of land use, ecological consistency and plant inter- <br />actions to ensure successful establishment. <br />4) Landscaping shall also comply with City of Pleasant on ordinances and policies re- <br />garding water conservation, <br /> <br />d) Prior to grading permit issuance the project developer shall submit a copy of the State <br />Water Resources Control Board Notice ofIntent (NOI) for coverage under the State Con- <br />struction Storm Water General Permit for projects with clearing, grading and excavation <br />exceeding the current standards. <br /> <br />e) Roof drains shall discharge and drain away from the building foundation to an unpaved <br />area wherever practicable. <br /> <br />57, Stormwater Construction Reauirements <br /> <br />The project development shall submit a Stormwater Pollution Prevention Plan (SWPPP) <br />for review and approval by the City Engineer prior to issuance of building or grading <br />permits. Failure to comply with the approved construction SWPPP may result in the <br /> <br />SR:06:271 <br />Page 21 <br />