Laserfiche WebLink
24. Submit soils and geotechnical engineering studies (page 112). <br /> <br />What: <br /> <br />When: <br />Who Verifies: <br /> <br />Individual developers. <br />Site-specific soils, geologic and geotechnical <br />engineering studies shall be required for <br />structures proposed on parcels within zones Ao, F, <br />and A1 (zones where the potential geologic hazard <br />is judged to be moderate to high). <br />Prior to tentative map or building permit approval. <br />Building Inspection Department. <br /> <br />25. Submit grading and erosion control plans (page 100 of the <br />FEIR). <br /> <br />What: <br /> <br />When: <br /> <br />Who Verifies: <br /> <br />Individual developers. <br />Submit grading and erosion control plans for each <br />development project within the Specific Plan area. <br />Grading plans shall balance cut and fill to the <br />maximum extent feasible. Grading plans shall <br />include provisions to limit impacts to adjacent <br />residents by minimizing grading near property <br />lines, phasing-grading operations to minimize noisa <br />disturbance, and frequent watering of exposed areas <br />to reduce dust. If fill is used on slopes, the <br />grading plan shall provide detailed recommendations <br />for slope gradients, preparation, acceptable fill <br />materials, and method of placement and degree of <br />fill compaction. Erosion control plans shall <br />include effective control methods as detailed by <br />the Association of Bay Area Governments. <br />Prior to final subdivision map and building permit <br />approval. <br />Public Works and Building Inspection Departments. <br /> <br />Bioloaical Resources <br /> <br />26. Ensure no net loss of wetland habitat (page 123). <br /> <br />What: <br /> <br />When: <br />Who Verifies: <br /> <br />Funding Developers. <br />Develop a creek habitat restoration plan as a part <br />of the master landscape plan that follows the <br />Specific. Plan guidelines, results in no net loss of <br />habitat-acreage or value, revegetates channel and <br />banks, and provides setbacks as specified in the <br />Specific Plan. The restoration plan will need to <br />be.created in consultation with the Department of <br />Fish and Game, and the U.S. Army Corps of <br />Engineers. <br />Prior to approval of master landscape plan. <br />Pleasanton Planning Department. <br /> <br />- 8 - <br /> <br /> <br />