Laserfiche WebLink
What: <br /> <br />When: <br />Who Verifies: <br /> <br />City of Pleasanton. <br />Modify the Specific Plan to include the cost of <br />Sunol Boulevard widening improvements along the <br />frontage of Parcels 1, 4, and 5 as part of the <br />Specific Plan capital improvement funding. <br />Prior to adoption of the Final Specific Plan. <br />Planning Department. <br /> <br />Drainaq~ <br /> <br />9. Prepare final design plans for creek improvements at Parcels <br />20, 24 and 25 (page 78). <br /> <br />What: <br /> <br />When: <br /> <br />Who Verifies: <br /> <br />Individual developers. <br />Design improvements for creeks within these parcels <br />shall be coordinated between a consulting biologist <br />and the design engineer to ensure that the removal <br />of riparian habitat is avoided where possible. A <br />report shall be submitted to the City identifying <br />repair work, stabilization methods and materials, <br />proposed enhancements and public easement <br />provisions. <br />Prior to approval of any development application~ <br />on these parcels. <br />Public Works Department in consultation With the <br />Planning Department.- <br /> <br />10. Develop Master Drainage Plan (page 78). <br /> <br />what: <br /> <br />When: <br /> <br />who Verifies: <br /> <br />Funding Developers. <br />Develop .a master drainage plan that addresses on- <br />site drainage and potential downstream and upstream <br />improvements. The plan shall also include an <br />analysis of the capacity, integrity and usefulness <br />of the private upstream dam. Ail comprehensive and <br />on-site drainage improvements in the study area <br />shall comply with the performance standards <br />contained in the plan as well as the City's "Design <br />Guide 1984" and "Standard Specifications and <br />Details". <br />Prior to tentative map approval for either Parcel <br />18, 20 or 23. <br />Public Works Department in consultation with the <br />Planning Department. <br /> <br />11. Follow specific drainage guidelines (pages 78 and 79). <br /> <br />What: <br /> <br />Individual developers. <br />Comply with the following specific drainage <br />guidelines: <br /> A. Ail creeks and drainage channels shall'be <br /> public storm easements and rights-of-way to <br /> <br />- 3 - <br /> <br /> <br />