Laserfiche WebLink
<br />PAP-93. Dennis and Barbara Georl!atos, ADDellants (PADR-1472, Stan and Stacev Knil!ht) <br />Appeal of the Zoning Administrator's approval of an application for administrative design <br />review to construct: (1) an approximately 180-square-foot covered patio; (2) an <br />approximately 292-square-foot first-floor addition on the rear; and (3) an approximately <br />1,251-square-foot second-story addition over part ofthe center and side portions ofthe <br />existing residence located at 779 Mirador Court. Zoning for the property is R-1-6,500 <br />(Single-Family Residential) District. <br /> <br />This item was continued from June 14, 2006. <br /> <br />Ms. Decker noted that staff had provided the Planning Commission with a thorough presentation <br />describing the background and scope of this item. The Commission had requested more <br />information on a City-sponsored mediation facilitation process for this project. Ms. Harryman <br />had indicated that any mediation process required willing participants. Staff had worked <br />diligently for the past two weeks and determined that the City did not have the funding or the <br />staffing resources to proceed with the costs incurred for the lacilitation/mediation process for this <br />process. Internal discussions identified that if a mediation process were to ensue, the Director of <br />Planning and Community Development, Jerry Iserson, would be that facilitator. She noted that a <br />number of neighborhood and on-site meetings with all interested parties had been held with no <br />success in determining compromises that could be easily reached where all parties could agree. <br /> <br />Ms. Decker summarized the discussions that had been held and described the following main <br />points discussed by all parties, none of which had been agreed to. <br /> <br />1. Reduction in the second story significant enough to reduce the perceived visual impacts <br />from the Imperiale, Georgatos, and Bennett homes; <br />2. The expansion of the first story in lieu of a second-story addition, as well as require <br />variances from the Municipal Code; <br />3. Planting of trees for screening the second story; <br />4. Removal of windows along the entire second story on the south elevation; <br />5. Removal of windows on the southern elevation, keeping the side lights on the east and <br />west elevations for the master suite; <br />6. Installation of seven-foot fencing along the Georgatos property at the interior fence <br />location; <br />7. Installation of seven-foot fencing along the Imperiale property; and <br />8. Installation of a greater-than-eight-foot fence along the Bennett property. <br /> <br />She noted that these points of discussion, with the exception of the fencing and proposed window <br />changes, were not new discussions. Staff has continued to recommend approval for the proposed <br />project per the June 14th presentation and staff report. Staff believed it was reasonable to support <br />the following: <br /> <br />1. Uphold the Zoning Administrator approval with reconfigurations at the second-story <br />addition's east and west elevations, replacing the large windows that were currently <br />joined on the Wensel side (east side) with separated two-foot by four-foot windows; <br />2. Remove the west window in the master suite which faces the Bennett property; <br /> <br />EXCERPTS: PLANNING COMMISSION MEETING MINUTES, June 28, 2006 <br /> <br />Page lof 5 <br />