Laserfiche WebLink
d_ Al 1-terrain and o££ -road veh i c 1 e s a nil camping sha 1 1 be <br />prohibited i n open space areas _ <br />S n addition , the applicant sha 1 1 provide a ach homebuyer w ith a <br />nature preservation awarene s s brochure _ <br />1 8_ The app 1 i cant sha 1 1 m it igate the c and it i ons o£ unstab 1 e s 1 ope s <br />and l ands l ide s a s stated i n the £ ina 1 E2R f or the project _ Such <br />mitigation sha 1 1 include the £ 0 1 1 ow ing a <br />a _ Al 1 1 ands 1 id.e s sha 1 1 be ident i £ i ed , mapped , and cata 1 ogued <br />by a geotechn i ca 1 eng ineer and cart i f i ed engineering <br />geo 1 og i st prior to tentative map approve 1 _ <br />b_ The depths and l atera l d imens i ons o£ a l l bedrock l and - <br />s l ide s aa-id l arge sur f is i a 1 s l ides sha 1 1 be determined by <br />sur £ ace and subsur £ ace methods that include dr i 1 1 i ng <br />and/or trenc2-iing_ <br />c _ Prior to start o £ construction , a 1 ands 1 ide rape i r p 1 an <br />sha 1 1 be prepared by a geotechn i ca 1 engineer and cart i £ i ed <br />engineering geologist for repair o£ all on-site landslides <br />and a 1 1 0 £ £ -site 1 ands 1 ide s that could a £ £ act <br />deve 1 opment _ <br />d_ _ £- measure s i n the 1 ands 1 ide rape i t p tan wou 1 d requ it e <br />destruction o £ her itage trees , the P 1 ann ing D hector sha 1 1 <br />be immediate 1y not i £ i ed _ Al 1 ava i 1 ab 1 e options shou 1d be <br />exp 1 ored , i nc 1ud ing po s s ib 1 e 1 os s o £ 1 of s or use o £ more <br />e 1 aborate engineering methods to protect trees _ No more <br />than 1 1 heritage tree s may be removed £ or 1 ands 1 ide <br />repair , i n addition to the 2 5 to be removed £ or grading <br />and construction _ <br />e. S ite drainage sha 1 1 be contro 1 1 ed s o that 1 ands 1 ides ca n <br />be minimized_ <br />£_ Area s o£ potent i a 1 s 1 ope i nsta b i 1 i ty sha 1 1 be ident i£ i ed <br />and recommendation s made £ or stab i 1 i z ing s 1 ope s_ <br />g_ The entire s i to sha 1 1 be incorporated into a geo 1 og i s <br />ha z arils abatement d i str i ct £ or the repair and on-going <br />maintenance o£ 1 ands 1 ides , unstab 1 e s 1 ope s, drainage <br />systems , catch basins , s i ltat i on ponds , and other g eo 1 og i c <br />hazards _ <br />h _ Al 1 recommendations o £ the geotechn i ca 1 engineer a nil <br />cart i f i ed engineering geologist sha 1 1 be i ncorporated i nt o <br />the grading plan _ <br />i_ Proper bu i 1 d i ng s etba c3cs £ r om creeks and uns tab 1 e s 1 op e s <br />and construction o £ bu i 1 d ing £ oundat i ons and cut and £ i 1 1 <br />s 1 op e s sha 1 1 be a s spec i£ i ed by the geot echn i ca 1 e ng i ne er <br />and cart i f i ed engineering geo 1 og i st _ <br />j _ Al 1 earth work , grading , £ i 1 1 p 1 ac ement , s 1 ope cutting , <br />and dra i n i n sta 1 1 at i on sha 1 1 be d irect 1y supervised by the <br />geot echn i ca 1 engineer and c art i £ i ed engineering geo 1 og i st <br />to ver i £y comp 1 i ante w ith r ecommendat i ons and conditions _ <br />Res _ PC - 9 O - 1 4 <br />2/ 1 4/ 9 0 - 8- <br />