Laserfiche WebLink
5 7 _ The storm dra i n system £ or the pro j ect sha 1 1 be designed such <br />that the summer £ 1 ow stay s w ith i n the p iped storm dra i n system _ <br />The w inter f lows sha 1 1 be a l l owed t o f low into the natura l <br />creeks _ The spec i f i c data i l s o£ the storm dra i n system sha 1 1 <br />be determined prior to the approva l o f the tentat ive map _ <br />5 8 _ The applicant sha 1 1 ad j ust the l of l ine between the subj act <br />property and the Lewi s property on Dub l in Canyon Road such that <br />the strip o £ l and between them i s granted to the Lewis ' Th i s <br />adjustment sha 1 1 be accomp 1 i shed prior to recordation o £ the <br />final map_ 59.TYte applicant sha11 comply with Standard <br />Conditions o£ Deve 1 opment 2 6 through S S A except 2 9 through 3 1 <br />4 6 ~ and 5 O _ <br />Res _ PC - 9 O - 1 4 <br />2/ 1 4/ 9 0 - 1 5- <br />