Laserfiche WebLink
SY buiJdin~, t'~ <br /> <br />i. Miscellaneous appa,ratus, Conduits and Conductors <br /> <br />For electrical apparatus, conduits and conductors for which a <br />permit is required but for which no fee is herein set forth <br /> <br />Note: this fee is not applicable when a fee is paid for one or <br />more services, outlets, fixtures, appliances, power apparatus, <br />busways, signs or other equipment. <br /> <br />Mechanical Permit Fees <br /> <br />1. Permit Issuance <br /> <br />For the issuance of each permit <br />For issuing each supplemental permit <br /> <br />Unit Fee Schedule <br /> <br />ao <br /> <br />fe <br /> <br /> For the installation or redemption of each forced-air or <br /> gravity-tyl~ furna~ or burner, including ducts and vents <br /> attached to such appliance, up to and including 100,000 <br /> Btu/h <br />For tim installation or relocation of each forced-air or <br />gravity-type furnace or burner, including ducts and vents <br />attached to such appliance over 100,000 Btu/h <br />For the installation or relocation of each floor furnace, <br />including vent <br />For the installation or relocation of each suspended <br />heater, recessed wall heater or floor-mounted unit <br />heater <br />For the installation, relocation or. replacement of each <br />appliance vent installed and not included in an appliance <br />permit <br />For tim ~ of, alteration of, or addition to each <br />heating appliance, refrigeration unit, cooling unit, <br />absorption unit, or each heating, cooling, absorption, or <br />evaporative cooling system, including installation of <br />controls r~ulated by this code <br />For the installation or relocation of each boiler or <br />compr~sor to and including ~ horsepower, or each <br />absorption system to and including 100,000 Btu/h <br />For the installation or relocation of each boiler or <br />compressor over ~ horsepower to and including 115 <br />horsepower, or each absorption 'system over 100',000 <br />Btu/h and including 1500,000 Btu/h <br />For the installation or relocation of each boiler or <br />compressor over 1:5 hors~ower to and including 30 <br /> <br />I1.00 <br /> <br />15.00 <br />4.50 <br /> <br />11.00 <br />9.00 <br /> <br />4.50 <br /> <br />16.50 <br /> <br />14 <br /> <br /> <br />