Laserfiche WebLink
<br />through a ground lease, with a below market lease term estimated at one dollar annually. Most <br />likely, the City would eventually own the facility. In exchange for the below market lease, the <br />Sharks will agree to provide a range of community oriented ice rink services at reasonable fees <br />and perhaps make other park improvements. <br /> <br />DISCUSSION <br /> <br />Based on staffs limited involvement to date, the proposed development could provide a <br />beneficial community based service that is currently unavailable in Pleasanton. As a result, staff <br />is recommending a full review of the development concept. There are some obvious <br />challenges/issues that must be addressed as part of this development as follows: <br /> <br />. Facility Access - Under its current design and in accordance with the Staples Ranch MOU, <br />access to the City park is limited to Stoneridge Drive, which mayor may not be <br />adequate/appropriate for the Sharks development. Also, improvements to EI Charro south <br />of Auto Mall Place are not anticipated under the Staples MOU and as a result, the current <br />two-lane configuration is most likely inadequate for access from the east to the park and the <br />Sharks Facility. Finally, while access may be possible from the north through the 17-acre <br />site identified for future commercial uses, bifurcating this site may prove to be problematic <br />for the Alameda County SPA. Attachment A shows a potential location and access for the <br />Sharks facility <br /> <br />. Project Financing - Sharks Ice has indicated that this development requires a significant <br />City financial contribution that could be met through a below market land lease. Assuming <br />this, a number of issues related to the City's return on its investment would be pursued <br />including park improvements, the level and cost of public services offered to the <br />community, ultimate ownership of the facilities, etc. Based on discussion to date, the <br />Sharks intend to provide all facility construction financing. <br /> <br />. Facility Location - Identifying the appropriate location for the facility and its integration <br />with other future park amenities requires additional study. Issues include facility access as <br />outlined above, maximizing park space and potentially accommodating hydromodification <br />(Le., storm water run off) from portions of the Staples site. <br /> <br />. Identification of Community Need - Through meetings with the Parks and Recreation <br />Commission and the Youth Commission, staff will assess the level of community interest in <br />the facility to determine if it represents the best use for the site. <br /> <br />If the Council approves staff recommendation, staff will begin the review process immediately. <br />Of initial concern is determining if the development will be processed as part of the Staples <br />Ranch development or as a separate issue. As mentioned, the existing Staples Ranch process <br />anticipates designing and programming park use after conclusion of the Staples Ranch review <br />process. However, considering potential impacts, issues and opportunities, it may be appropriate <br />to include this facility as part of the Staples development to take advantage of community input, <br /> <br />SR 06:231 <br />Page 3 <br />