Laserfiche WebLink
<br />BSK Proposal CP060034 <br />21 Febmary 2006 <br />Enclosure <br /> <br />BASIS FOR INVOICING <br />VETERAN'S MEMORIAL BUILDING <br />301 MAIN STREET <br />PLEASANTON, CALIFORNIA <br /> <br />Basis of Charges: <br /> <br />The charge schedule listed below will be our basis for invoicing. <br /> <br />Show-up (No Show) <br />Work up to 4 Hrs. <br />Work from 4 to 6 Hrs. <br />Work from 6 to 8 Hrs. <br />Work from 8 to 12 Hrs., Saturdays and Holidays <br />Work Over 12 Hrs. and Sundays <br />Swing Shift <br />Graveyard Shift <br />Sample Pick-up and Transport <br />Per Diem (Beyond 50 mile radius of job site) <br />Equipment (Torque Wrench, UT Equip., etc.) <br />Mileage (Beyond 50 mile radius of job site) <br />Parking and Toll Charges (if applicable) <br />Mileage <br />Progress Report Findings <br />Copy and Distribution <br />Final Report (as required) <br />Notarized Documents (as required) <br />Project Manager Daily Review <br /> <br />Bill 2 Hours (Minimum) <br />Bill 4 Hours <br />Bill 6 Hours <br />Bill 8 Hours <br />Time and One Half <br />Double Time <br />Add $9 per Hour <br />Add $ 12 per Hour <br />$ 75rrrip <br />$ 80IDay <br />$ 30IDay <br />$ 0.501Mile <br />Daily Rate <br />No Charge <br />No Charge <br />No Charge <br />$ 200 Each <br />$ 100 Each <br />No Charge <br /> <br />Fees: <br /> <br />Our services will be performed on a time and material basis at unit rates herein listed. Rates, charges and terms not <br />specifically quoted will be charged per our published Schedule ofF ees. We estimate our fees for this project at $27,925. <br />This estimate is based upon our years of experience in this profession, but it is an estimate only. We endeavor to limit <br />our charges to this estimate; however, events beyond our control may affect total cost. Example: if the work progresses <br />quicker than anticipated, fees could be considerably less; or, if the work progresses slower than anticipated, our fees may <br />exceed this estimate. <br /> <br />It is our practice to notifY you if it appears our fees will exceed our estimate, but due to the timing and nature of our <br />services and to eusure that your project is not delayed, this may not always be possible. Our invoices however will serve <br />as an update of our progress as well as fees charged versus our estimate. Invoices are payable upon receipt and deemed <br />delinquent if not paid within 60 days. Delinquent invoices may be subject to interest/service charges, and collection <br />expenses including attorney's fees, at our election. <br /> <br />Limitations <br /> <br />BSK Associates provides special inspection services to help ensure that the work is in substantial conformance to the <br />project documents and as required by CBC and Title 24. These services shall not be construed as acceptance of the <br />work or relieve the contractor in any way from his/her obligations and responsibilities as outlined in the applicable <br />construction documents. BSK assumes no responsibility for the safety of others on the jobsite or the methods and means <br />of construction. BSK will make every effort to respond to the emergent needs of your project, to assure better service <br />we ask that you schedule inspection/testing activities at least 24 working hours in advance. And to avoid show-up <br />charges, cancel such requests at least four working hours in advance of our arrival time when scheduling changes. <br /> <br />-2- <br /> <br />BSI( <br />