My WebLink
|
Help
|
About
|
Sign Out
SR 06:230
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 4:26:32 PM
Creation date
9/14/2006 4:25:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:230
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BSI( <br /> <br />EXHIBIT A <br /> <br />1181 Quarry Lane, Building 300 <br />Pleasanton, CA 94566 <br />(925) 462-4000. FAX (925) 462-6283 <br /> <br />21 February 2006 <br /> <br />B~ Proposal CP060034 <br />~C' <br />Fr- $'/ <br /><'1; V <br />~Q~s.: ..? ./ d ~ () <br />~~ &'06' <br />il'Q <br />o~~ <br /> <br />Mr. Jim Gotcher <br />City of Pleasant on <br />P.O. Box 520 <br />Pleasanton, California 94566-0802 <br /> <br />SUBJECT: <br /> <br />Earthwork Observations, Special Inspection and Materials Testing Services <br />Veteran's Memorial Building <br />301 Main Street <br />Pleasanton, California <br /> <br />Dear Mr. Gotcher: <br /> <br />BSK Associates is pleased to submit this proposal for the Earthwork Observations, Special Inspection and <br />Materials Testing Services that are required for Veteran's Memorial Building project. We understand that <br />the City has confirmed that this contract is subject to Prevailing Wages as detennined by California Director <br />of Industrial Relations. <br /> <br />We have developed this proposal package specifically with your needs in mind and based on the following <br />information: <br /> <br />. Our review of the plans and specifications <br /> <br />. Our experience with the special inspection requirements <br /> <br />. Our experience with other City of Pleasant on projects of this size and nature <br /> <br />. California Building Code and Title 24 <br /> <br />For your approval, we have included: <br /> <br />. Projected Scope of Work and Fee Estimate <br /> <br />. Basis for Invoicing <br /> <br />Rates not specifically quoted will be charged per our published Schedule of Fees. The hourly rates/charges <br />quoted are for the project duration. <br /> <br />In order for BSK to assist you in reducing exclusions from our Final Report, a copy of the project Testing <br />and Inspection Sheet (prepared by the Structural Engineer or Architect) should be forwarded to us prior to <br />our first site visit. Further, our Inspectors are required to note they are referring to Approved Plans during <br />their inspections; a copy should be made available on site. <br /> <br />Geotechnical Engineering. Engineering Geology' Environmental Services' Construction Inspection & Testing' Analytical Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.