My WebLink
|
Help
|
About
|
Sign Out
SR 06:223
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 4:17:35 PM
Creation date
9/14/2006 4:16:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:223
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />On February 21,2006, the City Council awarded the construction contract for this project <br />to the lowest bidder, AJW Construction of Oakland, in the amount of $81,300. <br /> <br />This project consisted of the construction of approximately 47 access ramps in the <br />northwest section of Pleasanton. The purpose of this project is to improve pedestrian <br />safety and improve accessibility for City sidewalks. <br /> <br />This annual project included the construction of new sidewalks and intersection ramps at <br />various locations where sidewalks and intersection ramps do not currently exist. <br />Locations were selected following completion of an engineering analysis. This is an <br />annual project that is intended to provide safe walking areas for pedestrians in older <br />sections of the City. <br /> <br />BUDGET <br /> <br />Funds <br />Annual Sidewalk and Intersection Ramp Installations, <br />CIP No. 045005 <br /> <br />$103,098 <br /> <br />Expenditures <br />Original Contract <br />Change Orders <br /> <br />TOTAL <br /> <br />$81,300 <br />$ 0 <br />$81,300 <br /> <br />Staff recommends that the surplus funds for the project, $21,798, be transferred to the <br />"Annual Sidewalk and Access Ramp Installation Project," CIP No. 055005 <br /> <br />FISCAL IMPACT <br /> <br />This project provides for on-going maintenance of existing facilities, and long-term fiscal <br />impacts are considered minimal. <br /> <br />Respectfully submitted, <br /> <br />-I<tZJL <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />c~~ ~~~ <br />David P. C~l~~ C:J <br />Director of Finance ~ \).l <br /> <br />IJv <br /> <br />Nelson Fialho <br />City Manager <br /> <br />SR 06:223 <br />Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.