My WebLink
|
Help
|
About
|
Sign Out
SR 06:152 (3)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:152 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 3:56:14 PM
Creation date
9/14/2006 3:55:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 <br />Memo to Mayor and City Councilmembers <br />September 19, 2006 <br /> <br />DISCUSSION <br /> <br />As indicated in the August 15,2006 staff report, staff is recommending Council proceed with <br />construction of the 1.4 million gallon reservoir and rough grading for the tank access road as <br />contemplated in the Specific Plan and the Financing Program. Prior to proceeding with the construction <br />of these improvements, it is necessary to review anticipated Specific Plan infrastructure improvements <br />and costs and to identify a clear long and short-term strategy (Financing Plan) to meet these expenses <br />within the context of the Financing Program. <br /> <br />Attached are two spreadsheets representing the Financing Plan. A summary of the Financing Plan is as <br />follows: <br /> <br />Spreadsheet #1 - Summary of Vineyard Corridor Specific Plan Future Expenses and Revenue. The <br />primary purpose of this spreadsheet is to present expected future expenses for completing Specific Plan <br />infrastructure and to identify projected revenues to pay for these expenses. As indicated on the sheet, <br />staff anticipates $13,597,482 in expenses and projected revenue of$13,597,482. Clarification of some <br />information on this sheet is as follows: <br /> <br />. Water Infrastructure - This represents the total estimated cost for planned water improvements. <br />As the Council is aware, actual costs are based on final project bids, which may impact these <br />estimates. However, note that $4,600,000 of the total $8,531,206 is based on the bids outlined in <br />the August 15 report. The remaining $4,068,794 is based on estimates available at this time; the <br />actual costs will be based on final design and bids received to construct the improvements. <br /> <br />. Other Infrastructure and Payments Due - This information is based on staff estimates for these <br />projects and is subject to change based on actual bids results. Reimbursements are based on <br />staff's estimates and may change as a result of final negotiations. The Outstanding Sewer Loan <br />Payments Due City (Loan # I) line item represents the $1,178,625 the City advanced from the <br />CIP Sewer Fund for sewer improvements completed concurrent with the construction of the <br />realignment of Vineyard Avenue. The line item for Outstanding Water Loan Payments Due City <br />(Loan #2) for $385,000 represents the money already spent on design from the existing CIP <br />project Vineyard Corridor Infrastructure Improvements: Water Tank, Supply Line and Pump <br />Station (011023) approved in FY2003 for the design and construction of water projects. This <br />section also includes a line item of $808,423 for Project Contingencies and Revenue <br />Uncertainties reflecting the potential of increased project costs and less then anticipated revenue. <br /> <br />. Projected Revenue Sources represents the amount of funding staff anticipates will be received <br />from future development within the Specific Plan Area and certain reimbursements. It assumes <br />the development of all new homes, payments from 14 existing property owners, fees from the <br />City for the park and additional payments from the PUSD. The $4,758,494 reimbursements due <br />the City are derived from a number of sources including Signature Properties and the PUSD. <br />The line item City CIP Water Fund -Expansion for Non Corridor Improvements represents the <br />$645,000 contribution anticipated in the CIP Water Fund Project (011023) to cover a portion of <br />improvements, such as an increase in water storage tank and turn our capacity that will benefit <br />new and existing development outside ofthe Specific Plan area. Finally, revenue includes a <br />water rate fee adjustment, or other funding source, estimated at $655,000 for large residential <br />
The URL can be used to link to this page
Your browser does not support the video tag.