Laserfiche WebLink
<br />TABLE 1 <br /> <br />Shared Infrastructure Improvement Components and Estimated Costs <br /> <br />Part 1- Includes Lots 1-17 located in the western portion of the Vineyard Avenue Corridor area. <br /> <br />Infrastructure Type ofImprovement Estimated <br />Component Cost <br />Sewer Twelve-inch replacement trunk line from Bernal Avenue to $430.000 <br /> Tioga Court <br />Sewer Ten-inch trunk line from Tioga Court to the southwest corner $200.000 <br /> of Lot S at Vineyard Avenue <br />Roadway Sidewalk (including retaining wall) along the south side of $180.000 <br /> Vineyard A venue from the western border of Lot I to Lot 15 <br /> <br />Part 2 - Includes Lots 22-24 located south of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor area. <br /> <br />Infrastructure Type ofImprovement Estimated Cost <br />Component <br />Water Sixteen-inch water trunk line within the existing $960.000 <br /> Vineyard Avenue, and Zone 7 Turn-out #6 <br /> modifications <br />Sewer Sewer pump station and force main $520.000 <br /> <br />Part 3 - Includes Lot IS located north of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor Area. <br /> <br /> Infrastructure Type oflmprovement Estimated Cost <br /> Component <br /> Sewer Eight-inch sewer trunk line within the realigned $160.000 <br /> Vineyard A venue from the new pump station to the <br /> east end of Lot 18 <br />I Roadway Realignment of Vineyard Avenue from the east end of $1.500.000 <br />, the "S"-curve to the east end of Lot 18 <br /> Storm Water Outfall at Lot 18 $21,000 <br /> Detention <br />