My WebLink
|
Help
|
About
|
Sign Out
SR 06:152 (3)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:152 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 3:56:14 PM
Creation date
9/14/2006 3:55:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Financing Program #2. Upon approval of a tentative map, the City may allow partial <br />infrastructure extensions within Parts I, 2. and 3 if: <br /> <br />(a) the Lot to be developed would be fully served with all planned <br />infrastructure extended from the westerly end of the Plan Area: and <br /> <br />(b) the total Specific Plan fees generated by the Lot to be developed are <br />insufficient, when aggregated with monies in the Specific Plan fund, to <br />allow all infrastructure required in that sub-area to be fully installed. <br /> <br />Examvle 2 A. Lot 10 is the first lot wishing to develop. It must extend the Pa,.t I <br />infrastructure from the westerly end of the Plan Area across itsfromage. Lot <br />10 'sfour units do not generate funds sufficient to extend the i'!frastmctu,.e/iI,.ther <br />(there being no existing Specific Plan funds). The Part I sewer and roadway <br />improvements may stop at Lot IO and need not be installed easterly to Lot 15. the <br />easterly edge of the Part I sub-area. <br /> <br />The elementary school (located at the westerly edge of the Part 4 sub-area on Lot 19) is a <br />key element of the Specific Plan whose early development is encouraged. Should the <br />school seek to develop prior to Parts 1.4 private development. it will require some, but <br />not all, of the infrastructure required of other Part 4 projects. <br /> <br />Financing Program #3. Development of the elementary school may proceed <br />independently of any other development in the Plan Area with a minimum level of shared <br />infrastructure improvements. The City may coordinate with the School District by using <br />its utility enterprise capital improvement funds to assist in installing the minimum level <br />of infrastructure. Both the School District and the City would be eligible for <br />reimbursement as described in Financing Program #20. Minimal improvements required <br />are: <br /> <br />(a) Construction of the l6-inch water trunk line in the existing Vineyard <br />A venue, and Zone 7 Turn-out #6 modifications; <br /> <br />(b) Construction of all shared sanitary sewer improvements west of the school <br />site, or, on a temporary basis, installation of an on-site sewage holding <br />tank; <br /> <br />(c) Realignment of Vineyard Avenue from Lot 15 to the eastern Plan Area <br />boundary; and <br /> <br />(d) Construction of a sidewalk along the south side of Vineyard A venue from <br />Lot I to its intersection with the abandoned old Vineyard A venue. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.