My WebLink
|
Help
|
About
|
Sign Out
SR 06:152 (3)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:152 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 3:56:14 PM
Creation date
9/14/2006 3:55:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VINEYARD A VENUE CORRIDOR SPECIFIC PLAN <br /> <br />SHARED INFRASTRUCTURE FINANCING PROGRAM <br /> <br />RELATIONSHIP TO SPECIFIC PLAN <br /> <br />The Vineyard A venue Corridor Specific Plan was adopted by the Pleasanton City <br />Council on June I, 1999. The Plan contains an "Infrastructure Financing and Phasing" <br />chapter which provides policy direction for the required timing of the infrastructure <br />improvements and the cost sharing mechanisms to be used for these infrastructure <br />improvements. This Financing Program does not change any of the provisions of the <br />Specific Plan. Rather, it amplifies on the policies found in the Specific Plan by. providing <br />detailed mechanisms for the financing/construction of the shared infrastructure <br />improvements specified in the Plan. <br /> <br />The structure of the Financing Program is based on the planned development of the <br />existing thirty-three parcels within the Specific Plan Area. The benefits and obligations <br />specified in the Specific Plan inure to these pre-existing parcels. This Financing Program <br />continues this practice, referring to each pre-existing parcel as a "Lot" upon which the <br />obligations established in the Financing Programs are based. notwithstanding the number <br />of final parcels which may be created pursuant to the Plan. <br /> <br />Modifications to the Specific Plan in the future may have an effect on the shared <br />infrastructure, both as to its components and timing. The financing program contains a <br />basic framework for addressing future modifications. <br /> <br />PHASING OF IMPROVEMENTS <br /> <br />The Specific Plan sets forth the minimum improvements necessary to be constructed to <br />allow any development to occur in four discrete sub-areas. These improvements and <br />their most updated cost estimates are listed in Table I (Parts 1-4). In addition to the <br />minimum improvements, there are other improvements for which development in the <br />Specific Plan Area will share the obligation for constructing. These are also shown in <br />Table I (Part 5). <br /> <br />For any new development to occur in the Specific Plan Area, the Specific Plan requires <br />that the minimum improvements for that sub-area shall be installed prior to, or with, the <br />new development. This policy shall be implemented by following the programs listed <br />below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.