Laserfiche WebLink
<br />provision of the EVA was initially considered as an emergency access for fire protection. The <br />new homes will be required to be sprinklered. <br /> <br />An alternative alignment was studied which appears more feasible from an engineering/grading <br />standpoint: the EVA road would extend northwesterly from the upper end of the private street <br />on the Reznick property and then follow the alignment of an existing dirt road that crosses <br />through the Brozosky and Chrisman properties before connecting to the existing road on the <br />Berlogar property (see attachment # II ). <br /> <br />Interdepartmental discussions included identifYing the opportunities and benefits of placing a <br />water line loop from the new tank to Vineyard Avenue providing redundancy in the water <br />system. <br /> <br />If the new alignment were to be seriously considered, the direct benefit would be for the <br />Reznick and Berlogar developments and only very indirectly the Chrisman and Brozosky <br />developments. The new EVA alignment however, bisects the upper third of the Brozosky <br />property. As a paved widened road, it could be an attractive nuisance that surrounding families <br />may believe is an access trail. If this were to occur, the private property could be at some risk <br />by having pedestrians enjoy the new location. Secondly, the new alignment resides as an <br />existing 10 ft. cut into the slope on the southerly, uphill location. The widening would create a <br />larger cut into the hill and be much more visible to the Brozosky family disrupting the current <br />natural view of their existing and future private landscape. Both the Chrisman and Brozosky <br />developments are planned with homes located adjacent to the Old Vineyard Trail and would not <br />have the same benefit as the Reznick development. There is currently no consensus of the <br />property owners to provide the easement for the EVA and waterline loop at this time. <br /> <br />The Reznick development will be required to provide an easement to the width specified by the <br />Department of Public Works at the time of the recordation of the final map shown in the <br />location provided for by the Specific Plan. Should the City determine the need no longer exists <br />at a future date, an amendment to the Specific Plan may be required to remove the existing <br />alignment shown. <br /> <br />Home Site Locations <br /> <br />The Specific Plan indicates that all HR home sites must be located within the designated <br />development areas as generally depicted on the land use plan. The proposed home sites for Lots <br />2,4,5,6, and 7 conform to the locations shown on the Vineyard Avenue Corridor Land Use <br />Plan. Relocating the road as discussed above allowed one of the upper HR home sites to be <br />moved down adjacent to Old Vineyard Avenue (shown as Lot 1). Furthermore, the land use <br />plan shows the Lot 3 home site downslope and closer to the elbow in the street. Staff notes that <br />land use plans are not usually meant to be precise, but can be flexible. In this case, staff believes <br />that it would be acceptable to move one of the upper home sites downslope to Lot I as proposed <br /> <br />Page - 8 <br />