My WebLink
|
Help
|
About
|
Sign Out
SR 06:198
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2006 11:59:00 AM
Creation date
8/10/2006 11:40:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/15/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FIRST AMENDMENT <br />TO CONTRACT FOR CONSULTANT SERVICES: <br />S & C ENGINEERING <br /> <br />I EXHIBIT A <br /> <br />This First Amendment, dated August 15,2006, amends the "Contract for Consultant <br />Services for Engineering, and Specialty Inspections for the Valley A venue Railroad <br />Undercrossing" entered into on the I 9th day of July, 2005, between the CITY OF <br />PLEASANTON and S & C Engineering. <br /> <br />RECITALS <br /> <br />A. The parties desire to amend the Original Contract to provide for additional hours for <br />engineering shop drawing review and construction inspection services for the <br />Railroad bridge structure, including temporary shoring, the storm drain pump station <br />and the storm drain box culvert for the Valley Avenue Railroad Undercrossing. <br /> <br />NOW, THEREFORE, in exchange for mutual consideration, the receipt and value of which is <br />hereby acknowledged, the parties agree as follows: <br /> <br />I. The Scope of Work described in Exhibit "A" to the Original Agreement shall be <br />amended to provide for additional hours for engineering shop drawing review and <br />construction inspection services for the Railroad bridge structure including temporary <br />shoring, the storm drain pump station and the storm drain box culvert for the Valley Avenue <br />Railroad Undercrossing. <br /> <br />The Scope of Work described in the Original Agreement shall be further amended to include <br />additional compensation to the contract, not to exceed $ I 8,500.00, bringing the new not-to- <br />exceed amount to $95,670.00. <br /> <br />2. All other terms and conditions of the Original Agreement shall remain in full force and <br />effect. <br /> <br />This First Amendment is entered into as oftbe date first set-forth above. <br /> <br />CITY OF PLEASANTON: <br /> <br />By: <br />Nelson Fialho, City Manager <br /> <br />CONSULTANT: <br /> <br />By: <br />S & C Engineering <br /> <br />By: <br />Second signature required if corporation <br /> <br />ATTEST: <br /> <br />Karen Diaz, City Clerk <br /> <br />APPROVED AS TO FORM: <br /> <br />Michael Roush, City Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.