Laserfiche WebLink
<br />o Santa Rita Road at Black Avcnue - prohibit traffic from exiting the Santa Rita frontage <br />road opposite Black A venue. Reroute this traffic to the new signal at Francisco Street. <br />Eliminate the north crosswalk at the intersection. (PC voted 4-1 to retain this in the <br />circulation network model) <br />o Santa Rita Road at Pimlico/I-580 - climinate the south crosswalk <br />o Santa Rita Road at Stoneridge Drive - restripe and modify signal to convert #1 <br />northbound through into a third left turn lane <br />o Santa Rita at Valley widening for triple southbound and double wcstbound left turns (PC <br />noted 4-1 to retain this in the network modell <br />o Stanley Boulevard widening east of Main Street to accept double southbound left from <br />Main Street. <br />o Stoneridge Drive at Springdale Avenue <br />o Stoneridge Drive at 1-680 northbound - modify signal to allow a northbound <br />right/westbound through overlap period <br />o Sunol Boulevard at Sycamore Road - implement constrained gateway policy that <br />provides adequate green time for cast, west and southbound traffic in the afternoon, while <br />allowing LOS F conditions northbound. <br />o Valley Avenue at KolI Center Parkway north - unsplit cast/west signal phasing <br />o Vineyard Avenue at Ruby Hill Boulevard - continue constrained gatewav oolicv that <br />limits westbound through traffic in the morning to 200 vehicles per hour even though this <br />creates LOS F conditions. <br />o West Las Positas Boulevard at Hopyard Road - construct third westbound left turn lane <br /> <br />. Roadway Changes: <br />o Bernal Avenue widening west, including Bridge over Arroyo Del Valle <br />o Bernal Avenue widening cast, including Bridge over Arroyo Del Valle <br />o Gastlewead at Foothill to provide a short seeend westbOllRd lane Cmlntv jurisdiction <br />o Stanley Boulevard widening cast of Bernal Avenue to allow three eastbound through <br />lanes at intersection <br />o Happy Valley Bypass Road (Commissioner commented: Revise to Sycamore Creek Wav <br />Extension) <br />o 1-680 southbound on-ramp widening from Bernal Avenue to accommodate two <br />westbound left turn lanes <br />o 8pRng Street one wa)' westBOllRd Between First Street amI Railread Street no lonl!er <br />under consideration <br />o '1alle)' ".venue e)(tensien to Case/Junipero wi// be completed bv end 0(2006 <br />o Valley Avenue widening north of Bernal to create a new southbound right turn only lane <br />and accommodate three eastbound left turn lanes <br /> <br />Year 2025 Alternative B) - 1>leasanton intersection amI rOadWllY capacity enhancements - <br />Existing + Approved Pleasanton Land Development. plus regional 2025 development with <br />buildout of the Livermore and Dublin General Plans. <br />This traffic forecast included all of the Group 2 changes at intersections to reduce congestion, and addcd <br />several additional intersection changes, roadway widenings and roadway extensions included in the <br />1996 General Plan. Roadway widenings that were found to contribute very little to congestion relief <br /> <br />3 <br />