My WebLink
|
Help
|
About
|
Sign Out
SR 06:189
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:55:26 PM
Creation date
7/13/2006 3:54:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:189
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. Improved Method of Collecting Assessments. <br /> <br />GHADs are authorized to collect assessments along with the general property <br />tax. This avoids requiring separate collection by a private entity, such as a <br />homeowners' association. <br /> <br />4. Concerns Over Liability Less Likely to Discourage Needed Actions. <br /> <br />In addition, under state law (Government code sections 865 et seq.), GHADs are <br />given a degree of immunity from liability for actions they undertake. The State <br />Legislature intended that this provision encourage local public entities to take <br />remedial action to abate earth movement. <br /> <br />Procedure to Create GHADs <br /> <br />The basic steps for formation are: <br /> <br />1. The applicant or local agency prepares a Plan of Control. The Plan of Control <br />must be attached to the formation petition and, thus, is before the public and the <br />legislative body throughout the decision making process. The Plan of Control <br />must be prepared by a certificated engineering geologist and describe geologic <br />hazards, their location, the affected areas, and a plan for prevention, mitigation, <br />abatement and control of these hazards. The Plan of Control serves as a <br />"general plan" for the GHAD and addresses the GHAD's ongoing activities, <br />including the monitoring of geologic conditions, identification of geologic <br />hazards, construction of needed improvements, and the maintenance, repair, and <br />replacement of facilities. <br /> <br />2. The legislative body must adopt a resolution declaring that it will be subject to <br />the statutory provisions for initiating formation proceedings. <br /> <br />3. A petition signed by the owners of at least 10 percent of the property within the <br />proposed GHAD is presented to the legislative body. <br /> <br />4. The legislative body sets a hearing with notice to property owners within the <br />GHAD area. Property owners within the proposed GHAD may object to <br />formation. If it appears that owners of greater than 50 percent of the assessed <br />valuation of the GHAD area object, the legislative body must abandon the <br />formation proceedings. <br /> <br />SR:06: 189 <br />Page 4 of37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.