My WebLink
|
Help
|
About
|
Sign Out
SR 06:177
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:44:47 PM
Creation date
7/13/2006 3:42:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />schedule calls for construction of the subject project improvements in the <br />spring of 2007. <br /> <br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />The Engineering Division of the Public Works Department performs engineering studies and <br />design for Capital Improvement Projects either through in-house staff or through contracts <br />with outside consulting firms. This project was selected as a candidate for consultant services <br />due to its complexity and the need for additional engineering support to meet the project's <br />schedule. <br /> <br />PROJECT INFORMATION AND CONSULTANT'S SCOPE OF WORK <br /> <br />The Old Stanley Boulevard Improvement Project, CIP No. 055022, generally consists of <br />pavement rehabilitation and/or reconstruction of the existing roadway section, installation of <br />new concrete curb, sidewalks, and a new street lighting system. <br /> <br />CONSULTING FIRM SELECTION PROCEDURE <br /> <br />A total of eight Pleasanton firms providing engineering services were selected from the City's <br />consultant database, and were asked to submit responses to a Request for Proposal for the <br />design of the Old Stanley Boulevard project. The ftrrns contacted included: Bellecci & <br />Associates; Berryman & Henigar; Creegan & D'Angelo Consulting Engineers; Kier & Wright <br />Civil Engineers, Inc; Kirnley-Horn and Associates; MacKay & Somps Civil Engineers, Inc; <br />Ruggeri-Jensen-Azar & Associates, and Pakpour Consulting Group. <br /> <br />Two ftrrns responded to the Request for Proposal with Statements of Qualifications and scopes <br />of work, Bellecci & Associates and Kirnley-Horn. Staff has worked with both firms on similar <br />projects and found both to be capable and responsive. Staff reviewed the proposals and <br />determined that Kirnley-Horn was best suited for the design of the Old Stanley Boulevard <br />Improvement Project. <br /> <br />BUDGET <br /> <br />The scope of services, fee schedule and consultant agreement for Kirnley-Horn & Associates <br />are attached as Exhibits A and B. Funding for the consulting fees will be paid for by the <br />authorized project funds. <br /> <br />SR 06:177 <br />Page 2 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.