My WebLink
|
Help
|
About
|
Sign Out
SR 06:163
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:43:33 PM
Creation date
7/13/2006 3:36:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E.:~hlb,f- A <br /> <br />6 CITY'S STANDARD CONTRACT/ ~ETHOD OF PAY~ENT <br /> <br />Beyaz & Patel has read the City's standard Consultant Agreement and will enter into <br />such agreement if selected for the proposed scope of work. Beyaz & Patel meets the <br />indemnification requirements. Certificates of insurance with required endorsements will <br />be provided when a contract is executed. <br /> <br />We understand that the City's method of payment is on a time-and-material basis with a <br />maximum "not to exceed" fee. <br /> <br />7 LABOR-HOURS FOR SCOPE OF SERVICES <br /> <br />Detailed evaluation of the concrete surfaces, at suspected corrosion areas, is not included <br />in our pricing at this time, as it is too difficult to accurately scope out prior to conducting <br />this concrete condition survey. Concrete coring, half-cell potential mapping and concrete <br />hardness testing are useful tools that can be utilized if and where warranted. We intend <br />to discuss these items with City officials after the site reconnaissance. <br /> <br />The labor hours to complete the proposed scope of work are as follows: <br />Task YPatel SPatel D Howard CPao CADD Admin <br />1 Project Plan 3 3 3 <br />2 Project Kickoff 3 3 3 <br />3 Initial Investigation 40 16 <br />4 Detailed Evaluation 8 24 60 <br />5 Report Preparation 8 16 10 6 <br />6 Review Report with City 4 <br />Total Hours 8 34 54 98 10 ---L. <br />Our hourly billing rates for FY 2006 are presented below: <br />Principal Engineer $181 <br />Managing Engineer $161 <br />Senior Engineer $13l <br />Engineer $103 <br />CAD Designer $ 99 <br />Administrative $ 79 <br /> <br />Based on the proposed scope of services, our estimated fees for services, including <br />mileage at $0.445/mile and other direct costs billed at cost, plus 15%, will not exceed <br />$29,800. <br /> <br />i) 1),7) Reyaz & Patel, Inc. <br />~..!.-.!..J Consulting Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.