My WebLink
|
Help
|
About
|
Sign Out
SR 06:165
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2006 11:38:49 AM
Creation date
6/16/2006 11:10:46 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/20/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Overlay: This construction method involves grinding the edges of the existing pavement, and <br />placing a new surface course of 1.75" thickness of asphalt concrete on top of the existing <br />pavement. <br /> <br />BIDS <br /> <br />Sealed bids for this project were opened on June 6, 2006. There were a total of four (4) bids <br />received that ranged frorn $2,246,736 to $2,423,034 compared with the engineer's estimate of <br />$2,262,268 (see attached Bid Summary). <br /> <br />The low bid of $2,246,736 was received from O'Grady Paving of Mountain View, California. <br />Previous work performed by O'Grady Paving, Inc. was verified to be satisfactory. <br /> <br />BUDGET <br /> <br />Project funding and estimated expenditures are presented below: <br /> <br />Funding <br />CIP # 055003 remaining (Gas Tax & Meas. B) $ <br />CIP# 065003 $ <br />CMA TIP Grants $ <br />Total: $ <br /> <br />1,738,334.00 <br />500,000.00 <br />275,000.00 <br />2,513,334.00 <br /> <br />Estimated Expenditures <br />Construction Bid <br />Construction Contingency (10 %) <br />Construction Services: <br /> <br />Total: <br /> <br />$ 2,246,736.00 <br />$ 224,673.00 <br />$ 40,000.00 <br />$ 2,511 ,409.00 <br /> <br />Staff recommends $825,000 from Annual Resurfacing of Various City Streets, CIP No. <br />065003 be transferred to the subject project. Funding from CIP No. 065003 will be available <br />on July 1, 2006. As noted below, start of construction for this project is forecasted for late <br />July, 2006. Costs will not be incurred until funding is available at the beginning of fiscal year <br />2006/07. <br /> <br />SR 06:165 <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.