Laserfiche WebLink
<br />- <br /> <br />-~~ ..\ <br />~ ....;.;,...- <br /> <br />,. <br /> <br />.... <br /> <br /> <br /> <br />. <br /> <br />Background <br /> <br />~ <br /> <br />The Phase I Specific Plan circulation system was planned to create a community that is not <br />heavily reliant upon the automobile, but instead one that enhances and facilitates alternative <br />transportation modes. The centralized location of the commercial/office center and the looped <br />network of streets and pedestrian routes combine to create a walkable, neighborhood oriented <br />community. Streets were planned to be compatible with fronting homes and characterized by <br />comfortable walking and bicycling environments, "calmed" traffic (slowed by way of traffic <br />roundabouts, on-site parking, narrow pavement widths, etc.), and rich streetscapes dominated by <br />rows of trees, <br /> <br />.. <br /> <br />.... <br /> <br />The Phase II Specific Plan circulation system is intended to expand upon and complement Phase I. <br />It is further planned to minimize the use of Phase I streets by Phase II traffic through the <br />location of open space, and by consolidating the more intensive Phase II land uses along a new <br />north/south collector street (Pleasanton Avenue), At the same time, the Phase I and II Specific <br />Plan Areas will be closely linked for convenient local travel by way of the street system and an <br />extensive trail system, <br /> <br />.. <br /> <br />.. <br /> <br />Existing Traffic Circulation System <br /> <br />.. <br /> <br />Most of the public street improvements for the greater 516-acre Bernal Property were constructed <br />in conjunction with Phase [ development (Figure 5-1). This consists of all public streets for both <br />Phase I and II Plan Areas located west of 1-6BO, including a single point of access to Bernal Avenue <br />and a connection under [-6BO that links both sides of the Bernal Property, It further includes all <br />residential streets in the Phase I area east of l-6BO, as well as the extension of Valley Avenue from <br />Bernal Avenue southeast to the Case Avenue/Junipero Street intersection. <br /> <br />... <br /> <br />Other street improvements within or adjacent to the 516-acre greater Bernal Property that were <br />required as a part of Phase [ development include: increased vehicular capacity improvements <br /> <br />Transportation Element <br /> <br />511 <br />