Laserfiche WebLink
<br />notes or individual detail drawings, where feasible, the Green Building measures to be <br />used to attain the applicable Green Building rating. Notwithstanding any other provision <br />of this Municipal Code, no building permit shall be issued for any Covered Project unless <br />and until the Green Building Compliance Official has approved the Pre-Permitting <br />Documentation submitted for the Covered Project. <br />b. Comoliance Review: Building and Safety Division staff shall verify that the <br />Green Building measures and provisions indicated in the Pre-Permitting Documentation <br />are being implemented at foundation inspection, framing inspection, and prior to issuance <br />of a final certificate of occupancy. The Green Building Compliance Official or the <br />Building and Safety Division staff may also conduct other inspections as needed to <br />ensure compliance with this Chapter. If, as a result of any such inspection, the Green <br />Building Compliance Official or Building and Safety Division staff determines that the <br />Covered Project does not comply with the Pre-Permitting Documentation, a stop-work <br />order may be issued. At the discretion of the Green Building Compliance Official, such a <br />stop-work order may apply to the portion of the project impacted by noncompliance or to <br />the entire project. The stop-work order shall remain in effect until the Green Building <br />Compliance Official determines that the Covered Project will be brought into compliance <br />with the Pre-Permitting Documentation and this Chapter. <br />c. Substitution of Credits: During compliance review for Covered Projects, <br />flexibility may be exercised by the Green Building Compliance Official to substitute the <br />approved credits with other credits in the approved, applicable Green Building Rating <br />System. Substitution shall occur only at the request of the Applicant and when it is <br />determined that the originally approved credits are no longer feasible. <br />d. Comoliance Documentation: Documentation shall be provided as <br />described below: <br />(1) Prior to final building approval and/or issuance of a final certificate <br />of occupancy for any Covered Commercial, City-Sponsored, Single-Family Residential, <br />Multi-Family Residential, or Mixed-Use Project: The Applicant shall submit to the <br />Green Building Compliance Official: <br /> <br />11 <br />