My WebLink
|
Help
|
About
|
Sign Out
SR 06:101
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2006 11:48:35 AM
Creation date
4/13/2006 3:14:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:101
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />Exhibit B <br /> <br />. The cost of preparing the Final EIR is <br />estimated based on our knowledge of <br />the project at this time. If the com- <br />ments on the Draft EIR exceed 60 <br />comments (including transcripts) <br />and/or raise new issues, EIP will con- <br />sult with the City regarding the desired <br />level of effort at that time. The esti- <br />mate of 60 discrete, non-repetitive <br />comments addresses only those com- <br />ments that EIP will need to address. <br />Responses for transportation-related <br />comments would be prepared by <br />Dowling Associates and provided to <br />EIP for inclusion in the Final SEIR. <br /> <br />. The EIR will analyze no more than <br />two alternatives to the proposed pro- <br />ject, in addition to the No Project <br />Alternative. The development of the <br />alternatives will be EIP's principal re- <br />sponsibility with concurrence from the <br />City staff. <br /> <br />. The City will provide all relevant <br />background studies, reports, plans, en- <br />viron-mental documents, and GIS data. <br /> <br />Factors that would increase the scope of <br />work and estimated costs outlined in the <br />proposal include: <br /> <br />. Attendance at additional meetings <br />beyond those budgeted (a per cost <br />meeting is provided in the accompany- <br />ing cost estimate); <br /> <br />. Analysis of additional issues beyond <br />those discussed in this proposal or a <br />more detailed level of analysis than de- <br />scribed in this proposal; <br /> <br />. Changes III the project requmng <br />reanalysis or rewriting of report sec- <br />tions; <br /> <br />. Collection of data required for the EIR <br />beyond that described in this proposal; <br /> <br />. Responding to more comments than <br />assumed to address staff concerns or to ad- <br />dress issues raised during the public review <br />period; and <br /> <br />. Printing of additional copies of reports. <br /> <br />EIP Associates <br /> <br />3-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.