My WebLink
|
Help
|
About
|
Sign Out
SR 06:084
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2006 2:21:59 PM
Creation date
3/16/2006 2:21:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:084
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'MACTEC <br /> <br />March I, 2006 <br /> <br />Mr. Hui}lQ, P.E, <br />Assoei!(te Qjvir:angineer <br />Public Works f.Engineering D'lPartment <br />City ofPleasanton <br />200 Old lJ.tnlilAvenDe <br />P1easanton, California 94566-08.02 <br /> <br />SCOPE OJi'WORKFOR <br />PAVEMENT~$PECTIONS TO UPDATE raEl\fEnOl'OLITANTRANSI,'O~TATION <br />COMMISSION ~TC) PAVEMENT MANAGEMENT PROGRAM <br /> <br />Mr.Ho: <br /> <br />MACfEC Engineering & Consulting (lI.{AcrEC) is pleased to submit this scope of work 10 perform <br />visual pavement inspeetions 10 update the City o(Pleasanton'. me pavement managemeutprpgram. <br /> <br />MAcrEC, under a separate contract wilb the MTC, PT AP. 7 program, will mspeet approximately 60 <br />centerline miles of Cily streets, will update lbe City's pavement management database and will provide reports <br />summarizing the work performed and various budget scenarios. This scope of work and cost estimate is to <br />inspectlbe remaining approximately 134 centerline miles of City streets and inputlbe data into the City's MTC <br />datahase. This project will supplement and will be performed in conjunction wilb the MTC PTAP-7 project. <br />The scope of work is as follows: <br /> <br />. MACTEC will opdate lbe City's MTC database by including new streets accepted by City <br />since lbe last pavement management update. <br /> <br />. MACTEC will perform visual pavement cOl)dition surveys of approximately 134 centerline <br />miles of street pavements incltlded in the City's pavement management program, in <br />accordance to the MTC procedures forpavement distress identification. <br /> <br />. MACTEC will input the data into the City's database and will calculate the new Pavement <br />Condition Index (pCl) for the pavement sections. <br /> <br />. A PCI report of all the City streets will be submitted 10 the City for review and approval. <br /> <br />MACfEC can perform the above stated scope of work for thelotallump sum of$27,000. <br /> <br />Should you have any questions regarding MACI'EC's scope of work or cost, please Jeel free to contact <br />Jose F. l'atroni at 775-326-5378, ifoatronira!mactec.com; or Stuart E. Dykins at 775-326-5351, <br />sedvkinsliillnactec.com. <br /> <br />Sincerely, <br />MACTEC Engineeriog & ConsuTting <br /> <br />Stuart E. Dykins, P.E. <br />Principall!ntineer <br /> <br />lose F. Patroni, E.L <br />Task Manager <br /> <br />MA91FC Engineering and Consulling, Inc. <br />961 Mall~ Lane, SUite 110' Reno, Nit 89S02 <br />77Gc329-81~'I'ax: 775-3~O <br />WWW.D1lldt~.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.