Laserfiche WebLink
3 $8,050 $21,000 <br /> 4 $23,000 $60,000 <br /> 6 $46,000 $120,000 <br /> 8 $80,500 $210,000 <br /> 10 $126,500 $330,000 <br />Amounts above do not include water installation fees which are revised <br />pea-iodically based on current costs for labor and materials as authorized in <br />Water Installation Fees section above. <br />For any service connection larger than listed above, the City Engineer or his <br />duly appointed representative will determine the charge; or a battery of meters <br />may be used at the City Engineer's option. <br />Any change in use or addition requiring greater capacity will require the <br />payment of additional fees at the rates established herein as a condition of <br />conl/nued service. _, <br /> <br />Within the Area of Benefit as shown on the Exhibit labeled "Area of Benefit of <br />Additional Bonde Zone Water Reservoir", there shall be an additional water <br />connection fee surcharge as follows: <br /> 1992 $2,600 <br /> 1993 $2,912 <br /> 1994 $3,261 <br /> The surcharge shall increase each January 1 by 12 percent for each year <br /> thereafter. <br /> <br /> The Area of Benefit is intended to include all properties serviced by the <br /> Bonde Zone reservoir which are those properties between the elevations of <br /> approximately 390 feet and 550 feet and all properties at higher elevations <br /> which take water from the Bonde Zone reservoir. <br />Upon recommendation of the City Engineer and approval of the City Council, <br />the mount of this fee may be reduced for connections above the Bonde Zone, <br />upon a showing of exceptional water system improvement costs that make the <br />full fee inequitable. <br />This water connection fee surcharge ('surcharge') shall be due and payable <br />prior to the filing of the final map for any additional lots created within the <br />Area of Benefit. <br />In the event the surcharge has not been collected for a lot or housing unit prior <br />to application for a building permit, then the surcharge shall be paid prior to <br />issuance of a building permit. <br /> <br /> Page 37 <br /> <br /> <br />