My WebLink
|
Help
|
About
|
Sign Out
RES 99028
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1999
>
RES 99028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:25:34 PM
Creation date
3/24/1999 2:45:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/16/1999
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 1 <br /> 1-580/I-680 Flyover and Hook Ramps <br /> <br />Lead Agency Caltrans and the Alameda County Transportation Authority <br /> <br />Description The project consists of the construction of a southbound to <br /> eastbound flyover, a northbound to eastbound director connector, <br /> southbound on and off hook ramps and a northbound on ramp. <br /> <br />Cost Estimate The total project is expected to cost in excess of $120 million. <br /> <br />Status The project is currently under construction. It is expected to be <br /> completed by 2003. <br /> <br />Funding Most of the project is funded by Measure B, which has a <br /> requirement for local matching funds. The final portion of the local <br /> match, $5.55 million, is funded from TVTDF as the top priority <br /> project. <br /> <br />Schedule The project is currently under construction. It is scheduled for <br /> completion by 2003. <br /> <br />Need The project was approved by the voters of Alameda County as a <br /> portion of the Measure B sales tax program. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.