Laserfiche WebLink
TVTDF EXPENDITURE PLAN <br /> PROJECT DESCRIPTIONS <br /> <br />The eleven projects included in the TVTDF are described on <br />the following pages. These descriptions include the lead <br />agency, the current cost estimates, the status of the project, <br />the current funding situation for the project, the schedule, and <br />a synopsis of the need for the project. This information has <br />been obtained from a variety of sources and represents the <br />most current available information on each project. The <br />locations of these projects are described in Figure A. Maps <br />showing the location and limits of each project area are <br />included for reference. <br /> <br />The TVTDF projects are as follows: <br /> <br />1. 1-580/I-680 FLYOVER AND HOOK RAMPS <br />2A. STATE ROUTE 84 CORRIDOR IMPROVEMENTS - 1-580 TO <br />1-680 <br />2B. ISABEL ROUTE 84/I-580 INTERCHANGE <br />3. 1-680 AUXILIARY LANES BETWEEN BOLLINGER CANYON <br />ROAD AND DIABLO ROAD <br />4. WEST DUBLIN-PLEASANTON BART STATION <br /> 5. 1-580 HOV LANES FROM TASSAJARA ROAD TO VASCO <br /> RoAD <br /> 6. 1-680 HOV LANES FROM STATE ROUTE 84 TO TOP OF <br /> SUNOL GRADE <br /> 7. 1-580/FOOTHILL ROAD-SAN RAMON ROAD INTERCHANGE <br /> MODIFICATIONS <br /> 8. 1-680/ ALCOSTA BOULEVARD INTERCHANGE <br /> MODIFICATIONS <br />9. CROW CANYON ROAD SAFETY IMPROVEMENTS <br /> 10. VASCO ROAD SAFETY IMPROVEMENTS <br /> 11. EXPRESS BUS SERVICE <br /> <br /> <br />