Laserfiche WebLink
Action P/an <br /> <br /> Tri-Valley Action Plan <br /> Highways D3nv Yc Vsr=!c-n (Continued) <br /> <br /> Key Locations <br /> <br /> East of Sycamore East of <br /> Facilily: Camino Tassajara Valley Road Crow Canyon <br /> <br /> 2. Consistent with the provisions of the Dou,qhert~ Valley Seffie- <br /> merit A,qreement. control amwth to meet intersection level of <br /> sefwce standards. Thc ;~-':-': :hc'--",~ ,,,c <br /> <br /> · ..... .~^,; ...... ;,^ ^L,;^_.~.~ 'n,: .... <br /> <br /> 3. Opt__.:: :.~:,' ~,::~__.cr---~c~ cf :__.__.Slit::) vch!c'_'~.- <br /> C:~.j.~: T:::G~_-r:. Carnino Tassajara within the Town of <br /> Danrill has a 2010 capacity consisting of four through lanes, <br /> acceleration/deceleration lanes at all intersections, left-turn <br /> pockets at all intersactions, and CaMTans standard Class II <br /> bicycle lanes. No action shall be considered that would eliminate <br /> such acceleration/decoleretion lanes or bicycle ianas. Th.~: <br /> <br /> P_~':':5~L?., S:-.~ R:..-.:.-. . :n_. C:n*:: C::*^ <br /> <br /> The northbound approach at the Camino Tassajara/Blackhawk <br /> Road/Crow Canyon Road intersection may be reconfkJured to <br /> cortsist of a 4-foot median island, two 12-foot left-turn lanes, one <br /> 12-foot through lane, one 12-foot through plus right-rum lane, <br /> and one 12-foot right-rum lane. This requires reducing the exist- <br /> ing median island from 12 feet to 4 feet, and reducing the exist- <br /> ing 16-foot right-turn lane to a 12-foot right-turn lane. This can be <br /> accomplished within existing curb-to-curb width. Any expansion <br /> or modifications at this intarsectjon shall be subject to the ap- <br /> proval of the Town of Danville. Th: T:'::~ :: D: .~:5!!_- .'---_: ::',: <br /> <br /> PM Peek-Hour 2010 Expected Intersection LOS Without Action Plan <br /> VIC 'LOS Unconstrained V/C <br /> <br /> Camino Tassajara and Blackhawk/Crow Canyon 1.15 F 1.35 <br /> Camino Tassajara and Sycamore Valley Road 0.37 A <br /> Camino Tassajare and Dlablo 0.39 A <br /> <br /> Volumes and capacity refer to PM peak-hour, peak-direction of flow. <br /> <br />Barton-Aschman Associates, Inc. 178 <br /> <br /> <br />