Laserfiche WebLink
45. The applicant shall ensure that fire protection facilities, including all surface roads, fire <br /> hydrants, and a water supply capable of furnishing the required fire flow shall be installed <br /> and serviceable prior to and during the time of construction. When alternate methods of <br /> protection are as approved by the Fire Chief, this requirement may be waived or modified. <br /> Proposed alternative methods of fire protection shall be submitted, in writing, to the Fire <br /> Chief. Work on the alternative fire protection methods shall not start without the <br /> approval of the Fire Chief. <br /> <br />46. All roads on the site are designated as fire apparatus access roads by the Fire Chief and <br /> must be maintained in accordance with Section 10.201 of the Uniform Fire Code and be <br /> accessible at all times from the start of construction until the project is completed. Curbs <br /> must be painted red or "No Parking" signs provided as required by the vehicle code. <br /> <br /> Police <br /> <br />47. If required by the Police Department, the building(s) shall be equipped with an alarm <br /> system, the type to be approved by the Police Department; this system shall be installed <br /> prior to occupancy of the building. <br /> <br /> Engineering <br /> <br />48. The applicant shall submit a final grading and drainage plan prepared by a licensed civil <br /> engineer depicting all final grades and on-site drainage control measures. This plan shall <br /> be subject to the review and approval of the City Engineer and/or the Director of Building <br /> Inspection prior to the issuance of any building permits. <br /> <br />49. The applicant shall submit a refundable cash bond for hazard and erosion control prior to <br /> issuance of an Engineering or Building Department permit. The mount of this bond will <br /> be determined by the City Engineer. <br /> <br />50. The design for the line, grade, and structural sections for the streets senring this <br /> development shall be subject to final review and approval by the City Engineer. <br /> <br />51. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of an encroachment permit. <br /> <br />52. The applicant shall include erosion control measures on the final grading plan, subject to <br /> the approval of the City Engineer. The applicant is responsible for ensuring that the <br /> contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br /> stabilized as soon as possible after completion of grading, in no case later than <br /> October 15. No grading shall occur between October 15 and April 15 unless approved <br /> erosion control measures are in place, subject to the approval of the Building Department. <br /> Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />SR:95:222 Page 10 <br /> <br /> <br />